Full team workshop (8 agents, 3 rounds) producing 7 decisions:
D-023 three-tier content model, D-024 NPC 10-axis generation,
D-025 social site atomic unit, D-026 timestamp-based sim tiers,
D-027 smuggler+detective vertical slice (supersedes D-006),
D-028 tagged line pool dialogue, D-029 population 30/50/20 split.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Pre-workshop planning document for Round 17. Proposes three-tier
content model, life-sim substrate, NPC generation axes, simulation
tiers, DLC architecture, and 20 open questions for team discussion.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Remove misplaced ROUND-16-STATUS.md from root (duplicate of
round-16-session-notes.md). Convert all macOS absolute paths to
project-relative paths across round-16 docs and design reference.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Round 15: README.md Steam page placeholder (Miri + Mellanie)
- Created README.md with game description for Steam page
- Placeholder structure with lorem ipsum for undetermined content
Round 16: Faction development (Miri, Paula, Gestalt)
- Full development of six factions with lore, politics, mechanics
- 3D reputation system (Trust × Usefulness × Exposure)
- Mechanical grounding with "First 30 Minutes" test
- v0.1 recommendation: Commission + Severance
- Session flagged for team input
Process changes (D-022):
- Retired DISCUSSION.md, work directly in round files
- Qatux mandatory in all team interactions
- Updated CLAUDE.md and agent personas
Co-Authored-By: Claude Opus 4.5 <noreply@anthropic.com>
Full team debate on engine paradigms, leading to Godot client +
Rust simulation via subprocess/IPC (D-020). Includes Tyre/Troblum
sidequest, IP pivot to original setting, and serialization format
selection. Updated discussions index.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Tyre's architecture evaluation (eval-godot-rust-bridge.md) and
Troblum's risk assessment (risk-godot-rust-bridge.md) for the
Godot 4 client + Rust simulation server approach. These reports
informed the D-020 engine decision and the shift from GDExtension
to subprocess/IPC.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Set up Commonwealth game project with complete agent team (18 agents),
discussion archives (12 rounds), briefing system, ticketing database,
Qdrant document search, and skill definitions. Establishes the
documentation and tooling foundation for engine selection and
implementation phases.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>