Commit Graph
2 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 b4e4c65830 docs(meta): update Sprint 32 briefings after workshop #796
Post-workshop briefing updates: joint notes with dependency chain,
planning team task list, copy/visual team scope adjustments, TEAM.md
roster update.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:00:03 +02:00
jpmschweitzerandClaude Opus 4.6 3d1ff6ad2e chore(meta): plan Sprint 32: Landfall
14 tickets across 4 teams + planning track:
- Copy (4): cultural audit #784 (analysis only), batch edits #793
  (blocked), system profiles #790, economic profiles #781
- Visual (4): heightmap spike #778, batch heightmaps #794 (blocked),
  screenshots #779, icon design #795
- Client (4): HUD layout #792, status/minimap/interaction → implant
  #786/#787/#788. #787 blocked by icon design.
- Planning (1): Phase 2 economics kickoff #796

New tickets: #793, #794, #795, #796

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 15:40:27 +02:00