Files
settled-reach/docs/workshops
jpmschweitzerandClaude Opus 4.6 f1b97d4a88 fix(economics): address 17 PR review comments on #114
Blocking fixes:
- V-13: legal_services demand_model compliance→market (build-breaker)
- D-184: political flag names match TOML (commission_certified etc.)
- D-184: professional services list matches TOML
- D-173: elasticity count 5→4, cross-ref to D-184
- Workshop outcomes: fix self-contradicting fusion fuel statement
- R-011: move to end of file (was between D-183 and D-184)

Should-fix:
- D-166 domain link scope.md→architecture.md
- Sprint briefing counts updated (13→17 D-records, #801 marked done)
- Burnelli-Sheldon added to agent roster + briefing created
- questions-architecture.md footer tally updated
- medical_services demand_model utility→market
- timber display name drop "/Biomass"

Polish:
- D-171 Groombridge clarified (clearing house, not co-issuer)
- hospitality description has Reach texture
- commission_certification shadow_viable=false rationale in description
- Ticket #801 description updated
- Wiki pages regenerated

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:18:41 +02:00
..

title, description, type, status
title description type status
Workshops Index Directory index of all multi-agent design workshops with status and convention docs workshop active

Workshops

Each workshop gets its own directory containing the brief and all output files.

Convention

docs/workshops/
  {workshop-name}/
    {workshop-name}-workshop-brief.md    # The original brief
    round1-{agent}.md                    # Round 1 per-agent analyses
    round2-{agent}.md                    # Round 2 per-agent syntheses
    si-ticket-changes.md                 # Ticket changes applied (if any)

Workshops

Workshop Round Status
Content Architecture 17 Complete
v0.1 Gap Analysis 18 Complete
Content Gap Analysis v0.1 Complete
Knowledge Graph & Information Boundaries Complete (2 rounds + synthesis, D-041 confirmed, 8 tickets created)
Observer Snapshot Pipeline Brief ready
NPC AI State Machines Brief ready
Save/Load Architecture Brief ready
Map Authoring Pipeline Brief ready
Wiki Review & Content Standards Complete (4 rounds + lead interview)
v0.1 Content Scoping Complete (2 rounds + closing, 38 tickets created)
Art Direction & Mood Board Complete (3 rounds + closing + technical session, D-019 amended, D-043-D-052 confirmed)
Control & Interaction Scheme Brief ready