docs(docs): add frontmatter to v01-gap-analysis workshop

Standardized YAML frontmatter on all 16 files.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
2026-03-14 00:01:28 +01:00
co-authored by Claude Opus 4.6
parent 563a295a90
commit ba3ade434e
16 changed files with 176 additions and 0 deletions
@@ -1,3 +1,14 @@
---
title: "Round 1 Workshop Response: Gestalt (Systems Design)"
description: "Systems design analysis of concept proof strength, fun/wow factor, and missing systems for v0.1"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: gestalt
round: 1
created: 2026-02-11
---
# Round 1 Workshop Response: Gestalt (Systems Design)
**Agent:** Gestalt (Systems Design & Fun Factor)
@@ -1,3 +1,14 @@
---
title: "Gap Analysis Workshop - Round 1: Gore (Themes & Endgame Design)"
description: "Thematic evaluation of concept proof claims, interpretive asymmetry gaps, and dual interpretation authoring needs"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: gore
round: 1
created: 2026-02-11
---
# Gap Analysis Workshop - Round 1: Gore (Themes & Endgame Design)
## Track 1: Strength of Concept Proof - Thematic Evaluation
@@ -1,3 +1,14 @@
---
title: "Round 1: Testability Deep-Dive (Track 4) — Hoshe"
description: "QA analysis of test architecture, Rust/Godot framework selection, IPC testing layers, and success criteria automation"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: hoshe
round: 1
created: 2026-02-11
---
# Round 1: Testability Deep-Dive (Track 4) — Hoshe
**Workshop:** v0.1 Gap Analysis Workshop
@@ -1,3 +1,14 @@
---
title: "Workshop Round 1 - Nigel: Sandbox & Replayability Analysis"
description: "Replayability analysis of concept proof claims, seed-based variation gaps, and replay ceiling estimates"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: nigel
round: 1
created: 2026-02-11
---
# Workshop Round 1 - Nigel: Sandbox & Replayability Analysis
## Track 1: Strength of Concept Proof — "What happens the SECOND time you play this?"
@@ -1,3 +1,14 @@
---
title: "Workshop Round 1 - Ozzie's Analysis"
description: "Emotional delivery and fun factor analysis of concept proof claims, observation pipeline design, and missing wow moments"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: ozzie
round: 1
created: 2026-02-11
---
# Workshop Round 1 - Ozzie's Analysis
## Track 1: Strength of Concept Proof + Track 2: Fun & Wow Factor
@@ -1,3 +1,14 @@
---
title: "Round 1 — Paula's Track 1 Analysis: Strength of Concept Proof"
description: "Narrative depth analysis of concept proof claims across mechanical coverage, narrative delivery, and emotional resonance"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: paula
round: 1
created: 2026-02-11
---
# Round 1 — Paula's Track 1 Analysis: Strength of Concept Proof
**Agent:** Paula (Narrative & Political Depth)
@@ -1,3 +1,14 @@
---
title: "Workshop Round 1 — Tyre (Technical Architect)"
description: "Technical gap analysis identifying hard blockers (collision, pathfinding, time system) and testability architecture recommendations"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: tyre
round: 1
created: 2026-02-11
---
# Workshop Round 1 — Tyre (Technical Architect)
**Tracks:** 3 (Things We May Have Forgotten) + 4 (Testability Deep-Dive)
@@ -1,3 +1,14 @@
---
title: "Round 2 Workshop Response: Gestalt (Systems Design)"
description: "Synthesis of unified observation system design, consolidated ticket list (49 to 33), and cross-agent priority alignment"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: gestalt
round: 2
created: 2026-02-11
---
# Round 2 Workshop Response: Gestalt (Systems Design)
**Agent:** Gestalt (Systems Design & Fun Factor)
@@ -1,3 +1,14 @@
---
title: "Gap Analysis Workshop - Round 2: Gore (Themes & Endgame Design)"
description: "Thematic synthesis defining load-bearing moments, Dual Lens Authoring Guide specification, and final thematic priorities"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: gore
round: 2
created: 2026-02-11
---
# Gap Analysis Workshop - Round 2: Gore (Themes & Endgame Design)
## Preamble
@@ -1,3 +1,14 @@
---
title: "Workshop Round 2 - Nigel: Cross-Pollination & Synthesis"
description: "Revised replay ceiling estimates (10-12 playthroughs), experience layer as replayability multiplier, and seed variation priority case"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: nigel
round: 2
created: 2026-02-11
---
# Workshop Round 2 - Nigel: Cross-Pollination & Synthesis
**Agent:** Nigel (Sandbox & Replayability)
@@ -1,3 +1,14 @@
---
title: "Workshop Round 2 - Ozzie's Response"
description: "Concrete observation event pipeline architecture, reaction to Paula's interpretive framing and Gore's ethical dimension"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: ozzie
round: 2
created: 2026-02-11
---
# Workshop Round 2 - Ozzie's Response
## Cross-Pollination, Pipeline Design, and Final Priorities
@@ -1,3 +1,14 @@
---
title: "Round 2 — Paula's Cross-Pollination Response"
description: "Three load-bearing narrative moments, Perspective and Arc authoring specification, and role-archetype authoring for seed variation"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: paula
round: 2
created: 2026-02-11
---
# Round 2 — Paula's Cross-Pollination Response
**Agent:** Paula (Narrative & Political Depth)
@@ -1,3 +1,14 @@
---
title: "Workshop Round 2 — Tyre (Technical Architect)"
description: "Revised testability decisions (GUT to gdUnit4), three-layer IPC test architecture, CauseChain endorsement, and final ticket list"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: tyre
round: 2
created: 2026-02-11
---
# Workshop Round 2 — Tyre (Technical Architect)
**Tracks:** 3 + 4 (Cross-pollination and synthesis)
@@ -1,3 +1,14 @@
---
title: "v0.1 Gap Analysis Workshop — Ticket Changes"
description: "Project manager summary of all ticket changes: 15 promotions, 3 new epics, 38 new stories, 21 dependencies added"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: si
round: 0
created: 2026-02-11
---
# v0.1 Gap Analysis Workshop — Ticket Changes
**Processed by:** Si (Project Manager)
@@ -1,3 +1,14 @@
---
title: "v0.1 GAP Analysis Workshop Brief"
description: "Workshop brief defining four analysis tracks: concept proof, fun/wow factor, completeness gaps, and testability deep-dive"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: ""
round: 0
created: 2026-02-11
---
# v0.1 GAP Analysis Workshop Brief
**Goal:** Stress-test the full v0.1 plan against concept proof, fun delivery, and completeness
@@ -1,3 +1,14 @@
---
title: "Workshop Outcomes: v0.1 Gap Analysis"
description: "Final outcomes summary: 6 decisions confirmed, 41 new tickets, critical path Sprint 1-5, and dependency chain"
type: workshop
status: archived
workshop: v01-gap-analysis
agent: qatux
round: 0
created: 2026-02-25
---
# Workshop Outcomes: v0.1 Gap Analysis
**Workshop:** v0.1 Gap Analysis