Files
settled-reach/docs/sprints/sprint-32/joint.md
T
jpmschweitzerandClaude Opus 4.6 b4e4c65830 docs(meta): update Sprint 32 briefings after workshop #796
Post-workshop briefing updates: joint notes with dependency chain,
planning team task list, copy/visual team scope adjustments, TEAM.md
roster update.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:00:03 +02:00

65 lines
3.1 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Sprint 32: Landfall — Joint Notes
**Goal:** Close Phase 1 — deliver remaining deliverables, validate pipelines with spikes, kick off Phase 2 economics design.
## Sprint Completion Proof
When Sprint 32 is done, you can:
1. **Review a cultural diversity audit** — `docs/design/cultural-diversity-audit.md` shows distribution across all 301 systems with remediation plan including non-culture exodus groups and great-scientist naming
2. **See one annotated heightmap** — a single inhabited planet with cities, rivers, roads annotated, validating the pipeline before batch
3. **View planetary shader screenshots** for wiki/GTTR arrival windows
4. **Read System Profile tables** with Bodies + Population rows for all 301 systems
5. **Read economic profile fields** (industries, imports, exports) for all 301 systems
6. **See implant-themed HUD** — status, minimap, stance, interaction prompt all using D-169 components
7. **Read Phase 2 design kickoff output** — D-records and child tickets under #747
## Phase 1 Context
Phase 1 deliverable: "Implant-ready Godot map of the Reach with click-throughs + wiki/GTTR popups."
**What's done:** 301 systems, body catalogs, star map insert with click-through popups, GTTR coverage, cultural sweep (10 systems), implant component library (D-169/D-170), HUD visibility groups.
**What this sprint closes:** Economic profiles (#781), system profile tables (#790), cultural audit (#784), heightmap spike (#778), planetary screenshots (#779).
**Phase 2 gate:** When #778, #779, #781, #784, #790 are done, epic #746 closes and #747 (Phase 2: Economics) unblocks. The planning ticket (#796) produces the first children of #747.
## Sprint 32 Updates (post-workshop)
**#796 complete** — Economics design workshop produced D-171 through D-183 in `decisions/economics.md` and 14 tickets (#797–#810) under #747.
**Pulled into Sprint 32:**
- #797 Author 25 new Tier-1 corps (copy team)
- #798 Define archetype taxonomy (copy team)
- #801 Define commodity catalog (planning team)
- #804 Extend systems.db schema (server team)
**Deferred to Sprint 33:**
- #794 Heightmap batch (was blocked by #778 spike + review)
## Not In Scope
- Batch heightmaps (#794) — deferred to Sprint 33, needs spike review first
- Phase 2 simulation binary (#806–#810) — Sprint 33+, gated by corporation corpus
- Character creation UI (#694, #618, #619) — Phase 4
- World generation — Phase 5
## Dependency Chain
```
#784 (cultural audit) → #793 (batch culture edits)
#778 (heightmap spike) → #794 (batch heightmaps)
#795 (icon design) → #787 (minimap + stance → implant)
#792 (HUD layout) → standalone, do first
#786 (status → implant) → standalone
#788 (interaction → implant) → standalone
#790 (profile tables) → standalone
#781 (economic profiles) → standalone
#779 (screenshots) → standalone
#796 (Phase 2 kickoff) → DONE
#797 (Tier-1 corps) → standalone, copy team, Phase 2 prerequisite
#798 (archetype taxonomy) → blocks #799, #800 in Sprint 33
#801 (commodity catalog) → standalone, planning team
#804 (schema extension) → blocks #805 in Sprint 33
```