Files
settled-reach/content
jpmschweitzerandClaude Opus 4.6 895a77ae68 fix(assets): address PR #83 review — tile map corrections
Review fixes:
- Terminal: fix sightlines comment col 22 → col 28 (actual window position)
- Last Shift: fix door comment col 21 → col 22, add spatial features
  (bar counter W-stubs cols 1-2, table clusters, card table, ticker mount)
- Maintenance corridors: extend transition corridor from 26 to 40 tiles
  per D-093 spec (grid now 58x6)
- Gate ground: expand customs zone from 8 to 10 rows per D-093 spec,
  correct freight (20 tiles west) / ped (10 tiles east) layout with
  6-tile corridor between (grid now 40x34)
- Gate gallery: add staircase entrance tile (col 1 row 0 = R)
- District description: update from "Three social sites" to five locations

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-04 23:10:48 +01:00
..