Blocking fixes: - V-13: legal_services demand_model compliance→market (build-breaker) - D-184: political flag names match TOML (commission_certified etc.) - D-184: professional services list matches TOML - D-173: elasticity count 5→4, cross-ref to D-184 - Workshop outcomes: fix self-contradicting fusion fuel statement - R-011: move to end of file (was between D-183 and D-184) Should-fix: - D-166 domain link scope.md→architecture.md - Sprint briefing counts updated (13→17 D-records, #801 marked done) - Burnelli-Sheldon added to agent roster + briefing created - questions-architecture.md footer tally updated - medical_services demand_model utility→market - timber display name drop "/Biomass" Polish: - D-171 Groombridge clarified (clearing house, not co-issuer) - hospitality description has Reach texture - commission_certification shadow_viable=false rationale in description - Ticket #801 description updated - Wiki pages regenerated Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
67 lines
3.2 KiB
Markdown
67 lines
3.2 KiB
Markdown
# Sprint 32: Landfall — Joint Notes
|
||
|
||
**Goal:** Close Phase 1 — deliver remaining deliverables, validate pipelines with spikes, kick off Phase 2 economics design.
|
||
|
||
## Sprint Completion Proof
|
||
|
||
When Sprint 32 is done, you can:
|
||
|
||
1. **Review a cultural diversity audit** — `docs/design/cultural-diversity-audit.md` shows distribution across all 301 systems with remediation plan including non-culture exodus groups and great-scientist naming
|
||
2. **See one annotated heightmap** — a single inhabited planet with cities, rivers, roads annotated, validating the pipeline before batch
|
||
3. **View planetary shader screenshots** for wiki/GTTR arrival windows
|
||
4. **Read System Profile tables** with Bodies + Population rows for all 301 systems
|
||
5. **Read economic profile fields** (industries, imports, exports) for all 301 systems
|
||
6. **See implant-themed HUD** — status, minimap, stance, interaction prompt all using D-169 components
|
||
7. **Read Phase 2 design kickoff output** — D-records and child tickets under #747
|
||
|
||
## Phase 1 Context
|
||
|
||
Phase 1 deliverable: "Implant-ready Godot map of the Reach with click-throughs + wiki/GTTR popups."
|
||
|
||
**What's done:** 301 systems, body catalogs, star map insert with click-through popups, GTTR coverage, cultural sweep (10 systems), implant component library (D-169/D-170), HUD visibility groups.
|
||
|
||
**What this sprint closes:** Economic profiles (#781), system profile tables (#790), cultural audit (#784), heightmap spike (#778), planetary screenshots (#779).
|
||
|
||
**Phase 2 gate:** When #778, #779, #781, #784, #790 are done, epic #746 closes and #747 (Phase 2: Economics) unblocks. The planning ticket (#796) produces the first children of #747.
|
||
|
||
## Sprint 32 Updates (post-workshop)
|
||
|
||
**#796 complete** — Economics design workshop produced D-171 through D-183 in `decisions/economics.md` and 14 tickets (#797–#810) under #747.
|
||
|
||
**#801 complete** — Commodity catalog workshop produced D-184 through D-187 and 5 follow-up tickets (#811–#815). 36 commodities, 21 production chains in `wiki/economics/`.
|
||
|
||
**Pulled into Sprint 32:**
|
||
- #797 Author 25 new Tier-1 corps (copy team)
|
||
- #798 Define archetype taxonomy (copy team)
|
||
- #801 Define commodity catalog (planning team)
|
||
- #804 Extend systems.db schema (server team)
|
||
|
||
**Deferred to Sprint 33:**
|
||
- #794 Heightmap batch (was blocked by #778 spike + review)
|
||
|
||
## Not In Scope
|
||
|
||
- Batch heightmaps (#794) — deferred to Sprint 33, needs spike review first
|
||
- Phase 2 simulation binary (#806–#810) — Sprint 33+, gated by corporation corpus
|
||
- Character creation UI (#694, #618, #619) — Phase 4
|
||
- World generation — Phase 5
|
||
|
||
## Dependency Chain
|
||
|
||
```
|
||
#784 (cultural audit) → #793 (batch culture edits)
|
||
#778 (heightmap spike) → #794 (batch heightmaps)
|
||
#795 (icon design) → #787 (minimap + stance → implant)
|
||
#792 (HUD layout) → standalone, do first
|
||
#786 (status → implant) → standalone
|
||
#788 (interaction → implant) → standalone
|
||
#790 (profile tables) → standalone
|
||
#781 (economic profiles) → standalone
|
||
#779 (screenshots) → standalone
|
||
#796 (Phase 2 kickoff) → DONE
|
||
#797 (Tier-1 corps) → standalone, copy team, Phase 2 prerequisite
|
||
#798 (archetype taxonomy) → blocks #799, #800 in Sprint 33
|
||
#801 (commodity catalog) → standalone, planning team
|
||
#804 (schema extension) → blocks #805 in Sprint 33
|
||
```
|