Commit Graph
4 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 f1b97d4a88 fix(economics): address 17 PR review comments on #114
Blocking fixes:
- V-13: legal_services demand_model compliance→market (build-breaker)
- D-184: political flag names match TOML (commission_certified etc.)
- D-184: professional services list matches TOML
- D-173: elasticity count 5→4, cross-ref to D-184
- Workshop outcomes: fix self-contradicting fusion fuel statement
- R-011: move to end of file (was between D-183 and D-184)

Should-fix:
- D-166 domain link scope.md→architecture.md
- Sprint briefing counts updated (13→17 D-records, #801 marked done)
- Burnelli-Sheldon added to agent roster + briefing created
- questions-architecture.md footer tally updated
- medical_services demand_model utility→market
- timber display name drop "/Biomass"

Polish:
- D-171 Groombridge clarified (clearing house, not co-issuer)
- hospitality description has Reach texture
- commission_certification shadow_viable=false rationale in description
- Ticket #801 description updated
- Wiki pages regenerated

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:18:41 +02:00
jpmschweitzerandClaude Opus 4.6 9b1258568e docs(decisions): economics design workshop #796 — D-171 through D-187
Workshop #796 produced 13 D-records (D-171–D-183) defining the Phase 2
economics layer: three-currency system, commodity taxonomy, shadow
economy, corporation tiers, productivity seeding, simulation
architecture, TOML data pipeline.

Workshop #801 added D-184–D-187: commodity catalog (36 types), brands
are not commodities, gate transmission levels (mass+data+energy),
fusion fuel as intermediate (8:1 water yield).

R-011 filed (single currency rejected). Burnelli-Sheldon agent added.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:00:18 +02:00
jpmschweitzerandClaude Opus 4.6 b4e4c65830 docs(meta): update Sprint 32 briefings after workshop #796
Post-workshop briefing updates: joint notes with dependency chain,
planning team task list, copy/visual team scope adjustments, TEAM.md
roster update.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:00:03 +02:00
jpmschweitzerandClaude Opus 4.6 3d1ff6ad2e chore(meta): plan Sprint 32: Landfall
14 tickets across 4 teams + planning track:
- Copy (4): cultural audit #784 (analysis only), batch edits #793
  (blocked), system profiles #790, economic profiles #781
- Visual (4): heightmap spike #778, batch heightmaps #794 (blocked),
  screenshots #779, icon design #795
- Client (4): HUD layout #792, status/minimap/interaction → implant
  #786/#787/#788. #787 blocked by icon design.
- Planning (1): Phase 2 economics kickoff #796

New tickets: #793, #794, #795, #796

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 15:40:27 +02:00