Files
settled-reach/docs/workshops
jpmschweitzerandClaude Opus 4.8 fa8b6ebf08 docs(governance): file D-239 tile derivation contract, resolve Q-101
Resolves Q-101 — how a coarse Layer-1 cell + seed becomes coherent ~1m
voxel geometry across the scale jumps. The tile-derivation-contract
workshop output:

- three-carrier refinement chain RegionProfile -> ChunkContext -> VoxelColumn,
  pure deterministic, no authoring at the derivation layers
- district-temperature climate primitive (2x2 km, C, nullable) + separate
  moisture; everything climatic derives from temperature(+moisture)
- scattered, transient freeze/snow model (freshwater +5..-10, sea ice own
  band, snow moisture-gated; forms cold phase / melts warm phase)
- stateless f64-to-voxel domain warp (anti-squaring)
- 8 morphology families over a frozen 17-zone vocabulary, gated decision tree
- seams prevented at source (gate ordering + build-time matrix); valid
  geomorphic seams kept sharp + warped

Includes workshop brief, round-1 positions, and workshop-outcomes.md.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-07 12:14:55 +02:00
..

title, description, type, status
title description type status
Workshops Index Directory index of all multi-agent design workshops with status and convention docs workshop active

Workshops

Each workshop gets its own directory containing the brief and all output files.

Convention

docs/workshops/
  {workshop-name}/
    {workshop-name}-workshop-brief.md    # The original brief
    round1-{agent}.md                    # Round 1 per-agent analyses
    round2-{agent}.md                    # Round 2 per-agent syntheses
    si-ticket-changes.md                 # Ticket changes applied (if any)

Workshops

Workshop Round Status
Content Architecture 17 Complete
v0.1 Gap Analysis 18 Complete
Content Gap Analysis v0.1 Complete
Knowledge Graph & Information Boundaries Complete (2 rounds + synthesis, D-041 confirmed, 8 tickets created)
Observer Snapshot Pipeline Brief ready
NPC AI State Machines Brief ready
Save/Load Architecture Brief ready
Map Authoring Pipeline Brief ready
Wiki Review & Content Standards Complete (4 rounds + lead interview)
v0.1 Content Scoping Complete (2 rounds + closing, 38 tickets created)
Art Direction & Mood Board Complete (3 rounds + closing + technical session, D-019 amended, D-043-D-052 confirmed)
Control & Interaction Scheme Brief ready