Files
settled-reach/wiki/economics/commodities/habitat_modules.md
T
jpmschweitzerandClaude Opus 4.6 68867894e9 feat(copy): wiki commodity copy pass — 36 pages with flavor text (#812)
All 36 commodity stubs fleshed out with lore context, production chain
descriptions, and economic intelligence briefing voice. Key treatments:
fusion_fuel (D-187 8:1 ratio), services (location-bound mechanics),
brands distinguished from commodities per D-185.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-07 10:27:01 +02:00

24 lines
2.0 KiB
Markdown
Raw Blame History

This file contains ambiguous Unicode characters
This file contains Unicode characters that might be confused with other characters. If you think that this is intentional, you can safely ignore this warning. Use the Escape button to reveal them.
# Habitat Modules
| Field | Value |
|-------|-------|
| Name | Habitat Modules |
| Tier | final |
| Elasticity | unit_elastic |
| Base Price (Tractus) | 150 |
| Bulk Class | oversized |
| Unit | units |
| Production Ubiquity | regional |
| Demand Model | market |
| Commission Certified | No |
| Compact Contested | No |
| Shadow Viable | No |
| Panic Threshold (weeks) | 0 |
| Description | Complete living/working units for stations and settlements. 2-5 year lead times. |
Habitat modules are complete, pressurized living and working units manufactured for integration into orbital stations, surface settlements, and expanding population centers. Each unit includes life support interfaces, utilities routing, structural connections, and interior finishing to habitability standards. The production recipe requires 1.2 units of structural panels, 0.3 units of electronics, and 0.2t of chemicals — with the panel input creating a direct dependency on timber or stone availability in the supply chain.
Lead times of 2–5 years from order to delivery are structural, not market-driven. Large station expansions require coordinated panel supply, manufacturing capacity booking, and transport scheduling well in advance of the installation date. Operators planning population expansion programs treat habitat module procurement as a multi-year infrastructure commitment rather than a commodity purchase. Systems experiencing rapid immigration pressure — frontier expansion waves, post-disruption resettlement — face severe module shortages that cannot be resolved on short notice regardless of price.
Settlement density across the Reach is therefore partially a function of module lead-time management. Systems that run persistent module procurement programs and maintain forward inventory position their populations for growth; systems that procure reactively face population-to-capacity mismatches during growth phases. The 2-5 year figure is why experienced colony administrators consider module order placement to be among their most consequential routine decisions.