docs(workshops): complete QA test architecture workshop
3-round workshop with 7 agents (Tyre, Dudley, Stig, Hoshe,
Justine, Gestalt, Ozzie) plus Qatux documenting. Produced:
- 59-item prioritized test backlog (60 tickets under epic #455)
- Gauntlet test world spec: 7 rooms + hub, 48 entities
- Test client binary spec (tooling/test-client/)
- Determinism fixes (3 patches, ~22 lines)
- Server --test-mode + --port 0 design
- Content cross-reference validation (9 checks)
- make pre-pr pipeline (6-step)
- 38 client tests prioritized
- Anti-tedium features (reset plate, hub teleport, WRONG button)
- Human tester walkthrough
- CI pipeline design (deferred but documented)
Sprint 8 scope: ~17.75 team-days across 26 tickets.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>