Files
settled-reach/docs/briefings/si.md
T
jpmschweitzerandClaude Opus 4.6 5bb7ded841 docs(briefings): update all agent briefings with Round 17 decisions
Add D-023 through D-029 context (content architecture, NPC generation,
social sites, simulation tiers, vertical slice, dialogue, population
ratios) to all 18 agent briefings. Core workshop participants get
detailed action items; specialist/infrastructure agents get relevant
implications. Mellanie activated from standby for content authoring.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-10 23:58:20 +01:00

2.0 KiB

Si - Project Briefing

Last updated: 2026-02-10

Current Project State

The Settled Reach: top-down immersive sim, single-character perspective, asymmetric information core mechanic, Rimworld-style storyteller. 29 confirmed decisions, 17 discussion rounds complete. Engine selected (D-020). Vertical slice defined (D-027). Next major workstream: vertical slice implementation.

Decisions Relevant to Your Role

All decisions (D-001 through D-029) - manages tickets derived from confirmed decisions.

Round 17 Summary (Sprint Planning Context)

  • D-023: Three-tier content architecture (Tier 1 authored modules, Tier 2 templated, Tier 3 procedural)
  • D-024: NPC generation model (10 axes + CombatCapability component)
  • D-025: Social site as atomic template unit (4-8 NPCs, 15-40 tiles, single-ownership + reference links)
  • D-026: Simulation tiers (Active/Background/State-saved/Ungenerated with timestamp eviction)
  • D-027: Vertical slice = smuggler + detective, station district, 3 templates, 30-min success criterion
  • D-028: Dialogue system (tagged pools, 4 relational layers, trait modifiers, template content packs)
  • D-029: Population entanglement ratio (30/50/20, variable per seed)

Open Questions Assigned to You

All open questions - tracks as tickets for assignment and progress monitoring.

Current Priorities

Create sprint plan for vertical slice implementation (D-027). Break D-024 through D-029 into tickets. Track dependencies:

  • Miri's cultural guide (blocks Mellanie's content authoring)
  • Tyre's line previewer CLI (critical tool for Mellanie)
  • Hoshe's test plans (must precede implementation)
  • NPC ECS model (blocks template instantiation)
  • Template system (blocks dialogue system)

Vertical slice is the next major workstream — coordinate with Team Leader on sequencing and resourcing.

Key Documents

  • DECISIONS.md - all confirmed decisions
  • DISCUSSION.md - active discussion round
  • docs/discussions/ - archived rounds
  • TEAM.md - team roster