chore(meta): plan Sprint 32: Landfall
14 tickets across 4 teams + planning track:
- Copy (4): cultural audit #784 (analysis only), batch edits #793
(blocked), system profiles #790, economic profiles #781
- Visual (4): heightmap spike #778, batch heightmaps #794 (blocked),
screenshots #779, icon design #795
- Client (4): HUD layout #792, status/minimap/interaction → implant
#786/#787/#788. #787 blocked by icon design.
- Planning (1): Phase 2 economics kickoff #796
New tickets: #793, #794, #795, #796
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>