Files
jpmschweitzerandClaude Fable 5 2ca70d0228 docs(assets): PR #211 review fixes — ratified glazing tokens, D-257, manifest skip contract
Review round (Hoshe + Tyre, both REQUEST_CHANGES) fully addressed:
palette.md's glass carve-out re-keyed from retired never-shipped tokens
(precision_glass/smart_facade) to the ratified glass_curtain_wall (wall)
+ industrial_glazing (facade); the toon/PBR treatment promoted from a
docs-only ruling to D-257 (architecture, cross-refs D-235/D-244/D-043/
D-044/D-033) with palette.md §2 now citing it as authority; D-149 +
D-257 added to decision_refs; manifest.json _comment gains the explicit
underscore-prefix loader skip contract; master pipeline table Visual row
Stub -> Active; conventions.md mask pointer Section 3 -> 5; pre-existing
broken D-066 links in the mood-board transcript repaired (leave-cleaner).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-25 20:36:47 +02:00
..

title, description, type, status
title description type status
Workshops Index Directory index of all multi-agent design workshops with status and convention docs workshop active

Workshops

Each workshop gets its own directory containing the brief and all output files.

Convention

docs/workshops/
  {workshop-name}/
    {workshop-name}-workshop-brief.md    # The original brief
    round1-{agent}.md                    # Round 1 per-agent analyses
    round2-{agent}.md                    # Round 2 per-agent syntheses
    si-ticket-changes.md                 # Ticket changes applied (if any)

Workshops

Workshop Round Status
Content Architecture 17 Complete
v0.1 Gap Analysis 18 Complete
Content Gap Analysis v0.1 Complete
Knowledge Graph & Information Boundaries Complete (2 rounds + synthesis, D-041 confirmed, 8 tickets created)
Observer Snapshot Pipeline Brief ready
NPC AI State Machines Brief ready
Save/Load Architecture Brief ready
Map Authoring Pipeline Brief ready
Wiki Review & Content Standards Complete (4 rounds + lead interview)
v0.1 Content Scoping Complete (2 rounds + closing, 38 tickets created)
Art Direction & Mood Board Complete (3 rounds + closing + technical session, D-019 amended, D-043-D-052 confirmed)
Control & Interaction Scheme Brief ready
Body Map Viewer Complete (2 rounds + 2 lead interviews + post-ratification review; D-255 confirmed + 12 amendments; outcomes)