docs(briefings): update Hoshe with integration test coverage priorities
Adds directive to focus on client-server integration tests landing from Sprint 5, push for proper test harnesses, a dedicated test map for routing/edge cases, and edge case coverage over happy-path volume. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
This commit is contained in:
@@ -15,6 +15,16 @@ Read `decisions/architecture.md` (D-010, D-020, D-030) and `decisions/perception
|
||||
None assigned.
|
||||
|
||||
## Current Priorities
|
||||
|
||||
**ATTENTION — Integration tests are landing and coverage matters.**
|
||||
The client branch just merged into main with a real client-server integration test (#411) — spawns a live server, connects via TCP, validates the full movement and interact pipeline end-to-end. The product is tested when it is tested. Pay close attention to these integration tests: verify they run, verify they pass, verify they cover what they claim. When new integration tests land, that is the ground truth for product quality — not plans, not stubs.
|
||||
|
||||
Comprehensive test coverage is the priority. Push for:
|
||||
- **Proper test harnesses** — reusable fixtures that spin up server+client pairs, manage lifecycle, and tear down cleanly. Tests should be easy to write so people actually write them.
|
||||
- **A dedicated client-server test map** — a minimal, purpose-built map designed to exercise routing, pathfinding edge cases, interaction boundaries, visibility transitions, and protocol correctness. This map should NOT depend on content generators or YAML loading — it exists purely to test the mechanical contract between client and server.
|
||||
- **Edge case coverage over happy-path volume** — test what happens at boundaries: malformed packets, disconnects mid-tick, entities at map edges, interactions at max range, simultaneous inputs, tick desync scenarios.
|
||||
- **Don't get hung up on content generators** — content loading has its own test surface. Integration tests should isolate the transport and simulation loop from content variability.
|
||||
|
||||
**ACTIVATED.** Vertical slice test plan preparation:
|
||||
1. Write test plans for D-024 (NPC generation — verify 10 axes present, triangles formed)
|
||||
2. Write test plans for D-025 (template instantiation — verify single-ownership, reference links carry metadata)
|
||||
|
||||
Reference in New Issue
Block a user