Files
portainer-core/PLANS.md
T
jpmschweitzer e3b451b7b0 feat(ai): complete ADK migration and optimize system health checks
Major architectural changes and improvements:

## ADK Framework Migration (v0.10.0)
- Migrated from LangChain/LangGraph to Google ADK 1.3.0 with LiteLLM 1.80.5
- Improved tool calling reliability with local Ollama models
- Converted all 10 tools to ADK async generator format
- Updated streaming pipeline for ADK event system
- Enhanced error handling and agent initialization

## Model Optimization
- Switched from gemma3:12b (10GB VRAM) to gemma3:4b (4.8GB VRAM)
- Reduced VRAM usage from 91% to 43% (5.4GB freed)
- Optimized for production stability with memory headroom

## Health Check System Overhaul
- Optimized /health/full: 6ms response (was 30s+)
- Added model verification: confirms configured model is available
- New /health/diagnostics endpoint with optional deep testing
- Added currently loaded models tracking
- Clear emoji status indicators (✅/❌/⚠️)
- Fixed AGENT_AVAILABLE flag export for proper health reporting

## Ollama Client Enhancements
- Added list_models() method for model inventory
- Enhanced model verification in health checks
- Better error handling and reporting

## Documentation Updates
- Updated STATUS.md to v0.10.0-adk-migration
- Comprehensive CHANGELOG.md entry with migration details
- Updated PLANS.md showing Phase 4 complete
- Updated ai-orchestrator-plan.md with ADK status
- Added MIGRATION_PLAN_LANGCHAIN_TO_ADK.md
- Added ADK_Ollama_Research.md with implementation analysis

## Technical Details
- 10 tools: 7 infrastructure + 2 research + 1 response tool
- Framework: Google ADK with UnifiedAgent pattern
- System prompt: v7_adk_best_practice
- Container health: Now passing Docker healthchecks
- Response times: Simple queries ~0.3-1s, Research ~4-7s
2025-11-26 08:36:50 +01:00

5.7 KiB

Implementation Plans

This document tracks all implementation plans across the portainer-core project.

Active Plans

Current implementation work in progress:

AI Orchestrator Enhancement

Location: plans/active/ai-orchestrator-plan.md Status: ✅ Phase 4 Complete - ADK Migration Successful Phases:

  • ✅ Phase 1: OpenAI-Compatible API (Completed 2025-11-13)
  • ✅ Phase 2: Memory Systems (Completed 2025-11-23)
  • ✅ Phase 3: Research Capabilities (Completed 2025-11-24)
  • ✅ Phase 4: Framework Migration - LangChain → Google ADK (Completed 2025-11-26)
  • 📋 Phase 5: Multi-Agent Patterns (Future)
  • 📋 Phase 6: Production Hardening & RAG Optimization (Future)

Framework Migration Completed (2025-11-26) ✅:

  • ✅ Migrated from LangChain/LangGraph to Google ADK 1.3.0
  • ✅ Integrated LiteLLM 1.80.5 for Ollama compatibility
  • ✅ Converted all 9 tools to ADK async generator format
  • ✅ Upgraded model: mistral:7b → gemma3:12b
  • ✅ Optimized system prompt: v7_adk_best_practice
  • ✅ Enhanced agent health monitoring
  • ✅ Production testing and validation

Migration Benefits Achieved:

  • Improved tool calling reliability with Ollama models
  • Better streaming support with ADK event system
  • Model flexibility (Gemma, Mistral, Qwen families supported)
  • Cleaner, more maintainable architecture
  • Production-ready health monitoring

Current Implementation:

  • Framework: Google ADK 1.3.0 with LiteLLM
  • Model: gemma3:12b (~8GB VRAM)
  • Tools: 9 total (7 infrastructure + 2 research)
  • Performance: Simple queries ~0.3-1s, Research ~4-7s

Memory Architecture

Location: plans/completed/phase2-memory-system-complete.md Status: ✅ Completed 2025-11-23 Description: 3-tier memory system (buffer, Qdrant persistent + semantic) with multi-tenancy

Security Implementation

Location: plans/active/security-implementation-plan.md Status: 📋 Planning Phase Description: Google OAuth SSO via Authentik for external service access


Completed Plans

Historical implementation plans that have been finished:

Infrastructure Deployment (Phases 1-4)

Location: plans/completed/infrastructure-deployment-plan.md Completed: November 2025 Phases:

  • ✅ Phase 1: Foundation (Portainer, NPM, Ollama)
  • ✅ Phase 2: Networking (Headscale mesh VPN)
  • ✅ Phase 3: Monitoring (Uptime Kuma, Netdata, Heimdall)
  • ✅ Phase 4: Optimization (Watchtower, Duplicati)

AI Orchestrator Phase 1

Location: plans/completed/ai-orchestrator-phase1-guide.md Completed: November 2025 Deliverables: OpenAI-compatible API with model routing, streaming, function calling

AI Orchestrator Phase 1 Testing

Location: plans/completed/ai-orchestrator-phase1-tests.md Results: 10/10 tests passed, zero issues found

AI Orchestrator Phase 2 (Memory System)

Location: plans/completed/phase2-memory-system-complete.md Completed: 2025-11-23 Deliverables: 3-tier memory (buffer + Qdrant), multi-tenancy, auto-consolidation

AI Orchestrator Phase 3 (Research Capabilities)

Location: plans/completed/phase3-multi-agent-workflows-complete.md Completed: 2025-11-24 Deliverables: Web search (DuckDuckGo), content scraping, research detection, 100% test success

AI Orchestrator Phase 4 (Framework Migration)

Location: MIGRATION_PLAN_LANGCHAIN_TO_ADK.md Completed: 2025-11-26 Deliverables: Google ADK 1.3.0 with LiteLLM, 9 tools migrated, gemma3:12b model, improved reliability

Architecture Research

Location: plans/completed/architecture-research.md Completed: October 2025 Decision: Portainer + Docker Compose for container orchestration

Mesh Networking Strategy

Location: plans/completed/mesh-networking-strategy.md Completed: November 2025 Solution: Headscale (self-hosted Tailscale) for secure mesh VPN

Dashboard Consolidation Strategy

Location: plans/completed/dashboard-strategy.md Completed: November 2025 Solution: Organizr with custom service control widgets


Plan Management

Creating New Plans

  1. Create plan in plans/active/ directory
  2. Add entry to "Active Plans" section above
  3. Update STATUS.md with phase tracking
  4. Link from relevant documentation

Completing Plans

  1. Mark all phases as ✅ in the plan document
  2. Move from plans/active/ to plans/completed/
  3. Update this file (move to "Completed Plans" section)
  4. Update STATUS.md
  5. Update CHANGELOG.md with release notes

Plan Template

# [Feature Name] Implementation Plan

## Overview
Brief description of the feature/improvement.

## Motivation
Why this change is needed.

## Phases

### Phase 1: [Name]
**Status**: 📋 Planned / 🔄 In Progress / ✅ Completed
**Duration**: Estimated effort
**Deliverables**:
- [ ] Task 1
- [ ] Task 2

## Success Criteria
How to determine if implementation is complete.

## Testing Strategy
How the feature will be validated.