clean-house sweep over governance/ (validate green, 0 broken refs before and after): - RULE-ANCHOR-DRIFT (37): rewrote inline cross-reference links left over from before the decisions/questions/rejected subdir split — flat naming (questions-architecture.md, questions-process.md, rejected.md) and bare same-dir paths that were actually cross-type — to canonical subdir-relative form with current slugs. pql resolved these by ID so they were never broken to the tooling, only to GitHub anchor navigation. - RULE-RECORD-SORT (1): reordered decisions/architecture.md D-records to strictly ascending (the D-1..D-6 block had been appended after D-41); pure block move, line count unchanged, content identical. - RULE-FILE-OVER-THRESHOLD: deferred (architecture.md 435 > 350; splitting would re-churn the anchors just fixed). - EOF/whitespace and Q↔D backlinks clean. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
18 lines
1.1 KiB
Markdown
18 lines
1.1 KiB
Markdown
# Open Questions — Accessibility + i18n
|
|
|
|
---
|
|
|
|
### Q-13: Web production-mode a11y
|
|
- **Status:** Open
|
|
- **Question:** In a Flutter web release build, is the semantics tree always on (what we need for Playwright and for end-user screen readers) or gated behind an accessibility toggle (Flutter's default)?
|
|
- **Context:** Today the driver clicks `flt-semantics-placeholder` to activate. For user-facing builds we need semantics-always-on.
|
|
- **Source:** 2026-04-21 planning.
|
|
|
|
### Q-14: i18n plurals / gender / date-format tooling
|
|
- **Status:** Open
|
|
- **Question:** fframe's pattern covers straight key→string lookup with variable interpolation. Plurals, gendered forms, and ICU-style date formatting aren't in scope there. Do we add them to the i18n facade, defer to a runtime library (violates [D-31](../decisions/tooling.md#d-31-prefer-zero-deps-exact-pin)), or require catalogues to provide pre-formatted strings per count/gender?
|
|
- **Context:** Probably becomes painful at Tier 3 (git panel, problem counts) and Tier 4 (pql results).
|
|
- **Source:** 2026-04-21 planning.
|
|
|
|
---
|