Commit Graph
4 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 2235cc4c19 drop leading zeros from all D/Q/R/T IDs
pql 1.2.0 changed its record format to drop leading zeros. All
262 references across 18 files renumbered (D-001→D-1, T-043→T-43,
etc.). pql-plan.json export updated as the git source of truth
for the planning database. DB rebuilt via pql plan import.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-23 12:16:52 +02:00
jpmschweitzerandClaude 272b59e752 record design handoff decisions (D-043–D-045, Q-025, R-012)
test / unit + widget + golden + a11y (push) Failing after 41s
test / integration_test (xvfb) (push) Has been skipped
test / bundle smoke (xvfb 5s) (push) Has been skipped
test / daemon subprocess + web WASM smoke (push) Has been skipped
D-043: adopt token palettes from design, reject Material wrapper.
D-044: four bundled themes replace summer-night.
D-045: syntax highlighting tokens in the theme pipeline.
Q-025: body text face — mono everywhere vs Josefin Sans + mono.
R-012: MaterialApp wrapper rejected (conflicts with D-007).

Co-Authored-By: Claude <noreply@anthropic.com>
2026-04-22 16:11:40 +02:00
jpmschweitzerandClaude cede971646 migrate ADRs into D/R records; delete docs/ADRs/
Lift docs/ADRs/0001-0006 into decisions/:
  0001 → D-001 (CLI-first, not MCP)
  0002 → R-002 (Go sidecar; superseded by D-005)
  0003 → D-003 (pql as supporter tool; wrap, don't duplicate)
  0004 → D-004 (ignore file strategy)
  0005 → D-005 (Dart core; sidecar dissolved; ptyc as pql-peer)
  0006 → D-006 (CLI and event surface contract)

ADR 0006's trailing open-questions footer migrates to
questions-architecture.md as Q-001 / Q-002 / Q-003 (already landed
in the scaffold commit). Titles preserved verbatim; cross-references
updated to the new anchor-link style.

docs/ADRs/ deleted — originals remain in git history.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-04-21 17:13:37 +02:00
jpmschweitzerandClaude 4d515ce51e scaffold decisions/ with backlog from planning sessions
Adopt settled-reach's Q&D record convention. Confirmed decisions
live under decisions/<domain>.md as D-NNN; open questions under
questions-<domain>.md as Q-NNN; rejected alternatives in rejected.md
as R-NNN. Markdown is source of truth; .pql/pql.db (added later) is a
query index.

Backlog captured from the Tier-0 Flutter planning sessions: bare
WidgetsApp, theme pipeline, kernel admission rule, feature-first
layout, a11y + i18n as Tier-0 contracts, test pyramid, kanban over
Scrum, pql-owns-planning, Python stopgap sunset clause.

ADR migration (D-001, D-003-D-006 confirmed, R-002 rejected) is
staged for the next commit so the diff stays readable.

Co-Authored-By: Claude <noreply@anthropic.com>
2026-04-21 17:10:42 +02:00