Files
settled-reach/wiki/economics/commodities/structural_panels.md
T
jpmschweitzerandClaude Opus 4.6 68867894e9 feat(copy): wiki commodity copy pass — 36 pages with flavor text (#812)
All 36 commodity stubs fleshed out with lore context, production chain
descriptions, and economic intelligence briefing voice. Key treatments:
fusion_fuel (D-187 8:1 ratio), services (location-bound mechanics),
brands distinguished from commodities per D-185.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-04-07 10:27:01 +02:00

2.0 KiB

Structural Panels

Field Value
Name Structural Panels
Tier intermediate
Elasticity unit_elastic
Base Price (Tractus) 45
Bulk Class standard
Unit units
Production Ubiquity regional
Demand Model market
Commission Certified No
Compact Contested No
Shadow Viable No
Panic Threshold (weeks) 0
Description Pre-fabricated building components. Two production paths: timber or stone.

Structural panels are pre-fabricated building elements — walls, floors, ceiling cassettes, modular partitioning, pressurized station sections — manufactured at scale for assembly on-site. Two production routes feed the same output: the timber route (1.0t timber + 0.5t refined metals → 1.0 unit) and the stone route (1.5t stone + 0.5t refined metals → 0.8 units). Timber yields more per input cycle; stone yields less but uses a different and generally more available raw. Regional ubiquity reflects that panel manufacturing requires stable raw supply chains, which not every system maintains.

The two-route structure is the commodity's most important economic feature. A timber shortage on a world running the timber route forces either a switch to the less efficient stone route or import of finished panels from neighbors. A stone shortage on a stone-route world rarely causes disruption because stone is more geographically common than managed forest. Systems that have both routes available carry structural resilience in their construction sector that single-route systems lack.

Panels are a direct input to habitat modules (1.2 units) and rail infrastructure (1.5 units), making panel availability the gating factor for settlement expansion and transit development. Station construction programs in particular draw on panels intensively — station sections are modular by necessity, and each new habitation ring is largely a panel assembly problem. Disruptions in timber-primary corridors cascade into habitat module lead times, which cascade into settlement capacity expansion.