All 36 commodity stubs fleshed out with lore context, production chain descriptions, and economic intelligence briefing voice. Key treatments: fusion_fuel (D-187 8:1 ratio), services (location-bound mechanics), brands distinguished from commodities per D-185. Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2.4 KiB
Gate Components
| Field | Value |
|---|---|
| Name | Gate Components |
| Tier | final |
| Elasticity | elastic |
| Base Price (Tractus) | 800 |
| Bulk Class | oversized |
| Unit | units |
| Production Ubiquity | monopolistic |
| Demand Model | market |
| Commission Certified | Yes |
| Compact Contested | Yes |
| Shadow Viable | Yes |
| Panic Threshold (weeks) | 0 |
| Description | Gate maintenance and construction parts. Gate Corporation monopoly. Triple rare-minerals dependency. |
Gate components are the maintenance and construction units for span gates — the infrastructure backbone of all inter-system commerce and communication in the Reach. Production requires 1.0t of advanced alloys, 0.5 units of drive cores, and 0.3 units of lattice substrate, creating a triple rare-minerals dependency: rare minerals appear directly in alloys (0.3t), in drive cores (0.4t direct + embedded via alloy input), and in the electronics that feed drive core production. No other final good in the catalog concentrates rare mineral dependency so completely.
Gate Corporation holds an effective monopoly on gate component production and maintenance. This is not a regulatory designation — it reflects the reality that the engineering specifications, manufacturing infrastructure, and technical personnel required to produce functional gate components exist in one place. Gate Corp's monopoly is self-reinforcing: the expertise to certify that gate components meet operational standards resides in the organization that produces them. Commission certification is required, and the Commission's technical standards for gate components essentially codify Gate Corp's own manufacturing specifications.
Compact contestation of Commission authority over gate components follows from the general Compact position on Commission jurisdiction, complicated by the fact that gate infrastructure operates within Compact systems. A Compact system disputing Commission gate component certification is in tension with Gate Corp's service contracts — the gate runs on Gate Corp's hardware, and Gate Corp's warranty and service terms require certified components. The shadow channel for gate components is thin but real: counterfeit or refurbished components that lack the certification chain occasionally reach systems where the alternative is extended gate downtime. The decision to use uncertified gate components is made under maintenance duress, not as policy.