Files
settled-reach/docs/briefings/si.md
T
jpmschweitzerandClaude Opus 4.6 cfddcfb117 docs(briefings): extract shared PROJECT_STATE.md, purge stale boilerplate
Create PROJECT_STATE.md at repo root with cascade phase table,
decision count, and current sprint. All 18 briefings now reference
this file instead of duplicating the project state paragraph.

Also removes stale content from briefings:
- "v0.2 direction: generator-first" (contradicts D-166 cascade)
- "Sprint 25 generator spike confirmed as critical path" (Phase 5)
- Agent-specific generator prerequisite claims
- Gestalt "v0.2 Pivot" section reframed as "Key Design Pivots"

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 15:16:39 +02:00

2.8 KiB

title, description, type, status, agent, updated
title description type status agent updated
Si - Project Briefing Sprint and project manager — owns sprint planning, ticket tracking, v0.2 critical path dependency chain, and CI pipeline awareness for definition of done briefing active Si 2026-03-13

Si - Project Briefing

Last updated: 2026-03-13

Current Project State

See PROJECT_STATE.md for shared project state (cascade phase, sprint, decision count).

Decisions Relevant to Your Role

All decisions across all domains. Read decisions/README.md for the index. Query decisions DB for sprint planning:

make decisions-coverage   # Decision-to-ticket coverage by domain
make decisions-orphan     # Decisions without implementing tickets
make decisions-active     # List all active decisions

Open Questions Assigned to You

All open questions - tracks as tickets for assignment and progress monitoring.

Development Cascade (D-166)

Development follows a strict 6-phase cascade. Currently in Phase 1 (wiki content). Generator spike (D-119) is Phase 5.

Prerequisites that must exist before/during the generator spike:

  1. Miri: Zone identity spec + Van Maanen's Star culture profile — blocks voice, NPC gen, AI pipeline
  2. Araminta: Zone visual grammar, tile palettes — blocked by Miri zone identity spec
  3. Tyre: NpcBlueprint struct design — generator output format
  4. Mellanie: Culture-primary voice cards — blocked by Miri culture profile

Dependency chain:

Miri: Zone Identity Spec + Van Maanen's Star Culture Profile
  |-- Araminta: zone visual grammar, tile palettes
  |-- Tyre: generator zone template parameters, NpcBlueprint
  |-- Mellanie: culture-primary voice cards
  v
Tyre: Generator Spike (Sprint 25)
  |-- Produces: auto-generated location + NPCs
  v
Test: Can the player read NPC relationships from generator output?

Estimated timeline (Tyre): 7 sprints to proof-of-life playtest (generated location + legible characters + tycoon bookmark from creation to Day 3).

Current Priorities

Consult docs/sprints/ for current sprint briefing. Break v0.2 decisions (D-114 through D-137) into tickets if not already covered. Track dependencies above.

Development Workflow

See docs/DEVOPS.md for full procedures. Key awareness for sprint planning:

  • make ci must pass before any PR merges — definition of done includes CI green
  • make ci-server = lint-server → build-server → test-server
  • make ci-client = lint-client → build-client → test-client
  • Server work lives in server/, client work in client/, cross-boundary tests in tests/
  • Hoshe's test plans target these directories per D-030 testing architecture

Key Documents

  • decisions/ - domain-split decision files (see decisions/README.md for index)
  • docs/DEVOPS.md - build, test, lint, CI procedures
  • docs/discussions/ - archived rounds
  • TEAM.md - team roster