Create PROJECT_STATE.md at repo root with cascade phase table, decision count, and current sprint. All 18 briefings now reference this file instead of duplicating the project state paragraph. Also removes stale content from briefings: - "v0.2 direction: generator-first" (contradicts D-166 cascade) - "Sprint 25 generator spike confirmed as critical path" (Phase 5) - Agent-specific generator prerequisite claims - Gestalt "v0.2 Pivot" section reframed as "Key Design Pivots" Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2.8 KiB
title, description, type, status, agent, updated
| title | description | type | status | agent | updated |
|---|---|---|---|---|---|
| Si - Project Briefing | Sprint and project manager — owns sprint planning, ticket tracking, v0.2 critical path dependency chain, and CI pipeline awareness for definition of done | briefing | active | Si | 2026-03-13 |
Si - Project Briefing
Last updated: 2026-03-13
Current Project State
See PROJECT_STATE.md for shared project state (cascade phase, sprint, decision count).
Decisions Relevant to Your Role
All decisions across all domains. Read decisions/README.md for the index. Query decisions DB for sprint planning:
make decisions-coverage # Decision-to-ticket coverage by domain
make decisions-orphan # Decisions without implementing tickets
make decisions-active # List all active decisions
Open Questions Assigned to You
All open questions - tracks as tickets for assignment and progress monitoring.
Development Cascade (D-166)
Development follows a strict 6-phase cascade. Currently in Phase 1 (wiki content). Generator spike (D-119) is Phase 5.
Prerequisites that must exist before/during the generator spike:
- Miri: Zone identity spec + Van Maanen's Star culture profile — blocks voice, NPC gen, AI pipeline
- Araminta: Zone visual grammar, tile palettes — blocked by Miri zone identity spec
- Tyre: NpcBlueprint struct design — generator output format
- Mellanie: Culture-primary voice cards — blocked by Miri culture profile
Dependency chain:
Miri: Zone Identity Spec + Van Maanen's Star Culture Profile
|-- Araminta: zone visual grammar, tile palettes
|-- Tyre: generator zone template parameters, NpcBlueprint
|-- Mellanie: culture-primary voice cards
v
Tyre: Generator Spike (Sprint 25)
|-- Produces: auto-generated location + NPCs
v
Test: Can the player read NPC relationships from generator output?
Estimated timeline (Tyre): 7 sprints to proof-of-life playtest (generated location + legible characters + tycoon bookmark from creation to Day 3).
Current Priorities
Consult docs/sprints/ for current sprint briefing. Break v0.2 decisions (D-114 through D-137) into tickets if not already covered. Track dependencies above.
Development Workflow
See docs/DEVOPS.md for full procedures. Key awareness for sprint planning:
make cimust pass before any PR merges — definition of done includes CI greenmake ci-server= lint-server → build-server → test-servermake ci-client= lint-client → build-client → test-client- Server work lives in
server/, client work inclient/, cross-boundary tests intests/ - Hoshe's test plans target these directories per D-030 testing architecture
Key Documents
- decisions/ - domain-split decision files (see decisions/README.md for index)
- docs/DEVOPS.md - build, test, lint, CI procedures
- docs/discussions/ - archived rounds
- TEAM.md - team roster