9 tickets assigned. Teams: server (5), copy (3), planning (1). Sprint goal: extend zone-type template library from 2 to 31 zone types, wire server structs for D-142, eliminate Clippy debt. New ticket #676 created: assign teams to v0.2 story backlog (#614-#626). Tickets #669 and #672 reassigned from maintenance to server. Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>