Two-round workshop producing D-041 (Knowledge Graph Data Model): - Round 1: independent analyses from Dudley, Gestalt, SI, Tyre, Paula - Round 2: synthesis resolving debates + Gestalt mechanics validation Key decisions: - 4-level confidence hierarchy (Suspects < KnowsOf < KnowsDetails < Direct) - BTreeMap for deterministic iteration (D-010 principle 4) - Per-entity Component model, not centralized Resource - StableEntityId + EntityRegistry for save/load stability (partial Q-019) - Sprint 2 stub: structs + direct observation + basic decay (~6.5 dev-days) Resolved Q-016 (knowledge hierarchy), raised Q-024/Q-025/Q-026. Created tickets #361-#368 under epic #351, reconciled #49 children. Updated sprint 2 briefings, agent briefings, and decision files. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
3.3 KiB
Si - Project Briefing
Last updated: 2026-02-11
Current Project State
The Settled Reach: top-down immersive sim, single-character perspective, asymmetric information core mechanic, Rimworld-style storyteller. 41 confirmed decisions, 17 discussion rounds + 2 workshops complete. Engine selected (D-020). Vertical slice defined (D-027). v0.1 Content Gap Analysis Workshop complete — ~50 tickets identified across 7 categories. Knowledge Graph & Information Boundaries Workshop complete (D-041) — Sprint 2 ticket impact requires reconciliation with existing #49 epic children.
Decisions Relevant to Your Role
All decisions across all domains. Read decisions/README.md for the index. Query decisions DB for sprint planning:
make decisions-coverage # Decision-to-ticket coverage by domain
make decisions-orphan # Decisions without implementing tickets
make decisions-active # List all active decisions
Open Questions Assigned to You
All open questions - tracks as tickets for assignment and progress monitoring.
Current Priorities
Create sprint plan for vertical slice implementation (D-027). Break D-024 through D-041 into tickets. Workshop output (docs/workshops/content-gap-analysis_v0_1/SUMMARY.md) contains ~50 deduplicated ticket proposals across 7 categories. Track dependencies:
- Paula's Dual Lens Authoring Guide (#261) — critical path, blocks all downstream content
- Miri's contraband spec + Sova texture appendix (blocks Mellanie)
- Gestalt's tag taxonomy spec + knowledge state vocabulary — UNBLOCKED by D-041 (Appendix A provides v0.1 vocabulary)
- Hoshe's test plans (must precede implementation)
- NPC ECS model (blocks template instantiation)
- Template system (blocks dialogue system)
- Knowledge graph system (D-041) — Sprint 2 priority, blocks #112, #358, #356. Requires ticket reconciliation with #49 epic.
Vertical slice implementation + content authoring are now parallel workstreams — coordinate with Team Leader on sequencing and resourcing.
Knowledge Graph Workshop Ticket Impact (D-041)
See synthesis Part 8 for full details. Key actions:
- Create 8 new tickets as children of #351 (KnowledgeGraph component, StableEntityId, KnowledgeEventQueue, direct observation flow, basic decay, observer snapshot integration, unit tests, vocabulary for #309)
- Reconcile existing #49 children: Reparent #89, #138-142, #269, #272, #182, #360 under #351 or mark as resolved/deferred
- Update #112 description with interface contract from synthesis Part 7
- Update sprint 2 dependencies: KnowledgeGraph blocks #112, StableEntityId blocks #360, observer snapshot integration blocks #358/#356
Development Workflow
See docs/DEVOPS.md for full procedures. Key awareness for sprint planning:
make cimust pass before any PR merges — definition of done includes CI greenmake ci-server= lint-server → build-server → test-servermake ci-client= lint-client → build-client → test-client- Server work lives in
server/, client work inclient/, cross-boundary tests intests/ - Hoshe's test plans target these directories per D-030 testing architecture
Key Documents
- decisions/ - domain-split decision files (see decisions/README.md for index)
- docs/DEVOPS.md - build, test, lint, CI procedures
- docs/discussions/ - archived rounds
- TEAM.md - team roster