Files
settled-reach/.pql
jpmschweitzerandClaude Opus 4.8 e3327a0d01 chore(meta): hold asset track — T-1049/T-1050 -> backlog (needs sprite->3D re-scope)
Separated the asset pipeline from the cascade work. T-1049/T-1050 assume a sprite-centric
catalog; direction is 3D objects (Trellis .glb) in-world with textures as the only
flattened content. Held for re-scope. Cascade track (T-1044/T-1047) continues.

Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
2026-06-16 16:03:49 +02:00
..