12 tickets across 5 teams: server (7), client (2), visual (1), ci (1), planning (1). Template instantiation pipeline, cross-template triangles, save/load flow, fog shader tuning, generator workshop. Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>