Files
settled-reach/docs/workshops/README.md
T
jpmschweitzerandClaude Fable 5 77531a0eab docs(meta): body-map-viewer workshop brief signed off — T-1176 prep session
Three-way prep session (Jeroen + lead + Tyre) for the map-handler revision:
Jeroen's design outline captured verbatim, two clarification rounds, Tyre's
governance-delta/implications pass, brief co-written and ratified (zero
misrepresentations, zero blocking gaps), signed off by Jeroen with three edit
rounds (vocabulary repair tile->gridunit, client cache-store question with
SQLite fact base, explicit DQR/ticket deprecation sweep as gated deliverable).

Workshop: 5 seats (Dudley/Araminta/Stig/Tyre + Troblum r2), 2 rounds + lead
interview extendable at Jeroen's call, round 1 gated on measurements
T-1177/T-1178/T-1154/T-1179 (T-1180 non-gating). T-1176 in_progress with gate
blocker edges; T-1154 repurposed as measurement (3) and set ready.

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-23 18:29:21 +02:00

1.9 KiB

title, description, type, status
title description type status
Workshops Index Directory index of all multi-agent design workshops with status and convention docs workshop active

Workshops

Each workshop gets its own directory containing the brief and all output files.

Convention

docs/workshops/
  {workshop-name}/
    {workshop-name}-workshop-brief.md    # The original brief
    round1-{agent}.md                    # Round 1 per-agent analyses
    round2-{agent}.md                    # Round 2 per-agent syntheses
    si-ticket-changes.md                 # Ticket changes applied (if any)

Workshops

Workshop Round Status
Content Architecture 17 Complete
v0.1 Gap Analysis 18 Complete
Content Gap Analysis v0.1 Complete
Knowledge Graph & Information Boundaries Complete (2 rounds + synthesis, D-041 confirmed, 8 tickets created)
Observer Snapshot Pipeline Brief ready
NPC AI State Machines Brief ready
Save/Load Architecture Brief ready
Map Authoring Pipeline Brief ready
Wiki Review & Content Standards Complete (4 rounds + lead interview)
v0.1 Content Scoping Complete (2 rounds + closing, 38 tickets created)
Art Direction & Mood Board Complete (3 rounds + closing + technical session, D-019 amended, D-043-D-052 confirmed)
Control & Interaction Scheme Brief ready
Body Map Viewer Brief signed off (2026-07-25); round 1 gated on measurements T-1177/T-1178/T-1154/T-1179