Resolves Q-101 — how a coarse Layer-1 cell + seed becomes coherent ~1m voxel geometry across the scale jumps. The tile-derivation-contract workshop output: - three-carrier refinement chain RegionProfile -> ChunkContext -> VoxelColumn, pure deterministic, no authoring at the derivation layers - district-temperature climate primitive (2x2 km, C, nullable) + separate moisture; everything climatic derives from temperature(+moisture) - scattered, transient freeze/snow model (freshwater +5..-10, sea ice own band, snow moisture-gated; forms cold phase / melts warm phase) - stateless f64-to-voxel domain warp (anti-squaring) - 8 morphology families over a frozen 17-zone vocabulary, gated decision tree - seams prevented at source (gate ordering + build-time matrix); valid geomorphic seams kept sharp + warped Includes workshop brief, round-1 positions, and workshop-outcomes.md. Co-Authored-By: Claude Opus 4.8 (1M context) <noreply@anthropic.com>
title, description, type, status
| title | description | type | status |
|---|---|---|---|
| Workshops Index | Directory index of all multi-agent design workshops with status and convention docs | workshop | active |
Workshops
Each workshop gets its own directory containing the brief and all output files.
Convention
docs/workshops/
{workshop-name}/
{workshop-name}-workshop-brief.md # The original brief
round1-{agent}.md # Round 1 per-agent analyses
round2-{agent}.md # Round 2 per-agent syntheses
si-ticket-changes.md # Ticket changes applied (if any)
Workshops
| Workshop | Round | Status |
|---|---|---|
| Content Architecture | 17 | Complete |
| v0.1 Gap Analysis | 18 | Complete |
| Content Gap Analysis v0.1 | — | Complete |
| Knowledge Graph & Information Boundaries | — | Complete (2 rounds + synthesis, D-041 confirmed, 8 tickets created) |
| Observer Snapshot Pipeline | — | Brief ready |
| NPC AI State Machines | — | Brief ready |
| Save/Load Architecture | — | Brief ready |
| Map Authoring Pipeline | — | Brief ready |
| Wiki Review & Content Standards | — | Complete (4 rounds + lead interview) |
| v0.1 Content Scoping | — | Complete (2 rounds + closing, 38 tickets created) |
| Art Direction & Mood Board | — | Complete (3 rounds + closing + technical session, D-019 amended, D-043-D-052 confirmed) |
| Control & Interaction Scheme | — | Brief ready |