Files
settled-reach/.pql
jpmschweitzerandClaude Fable 5 5155474d14 chore(meta): T-1156 wave-1 design pass captured — T-1168 riparian forward contract, T-1169 labels split-out, T-1170 river-course invention (all gated behind wave 1)
Tyre's carrier ruling: rivers ride the EXISTING whole-body layer1 field
(no new wire field, neither ceiling touched); per-rung refinement is
client-side class filtering (river_class quantized from flow
accumulation — the one additive server change); discrete-geometry-vs-
continuous-field carrier rule established for wave 2. D-226 note added
on the rivers-ladder branch. Si's audit: skeleton is 512x256 heightmap-
resolution dot data (~76 km/cell) — planetary courses real now, sub-
heightmap course geometry named as T-1170, labels split to T-1169
(three dormant pieces, not free).

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
2026-07-23 07:54:41 +02:00
..