Files
settled-reach/docs/backups
jpmschweitzerandClaude Sonnet 4.6 2fddf8b6ca chore(meta): plan Sprint 27: Scale
9 tickets assigned. Teams: server (5), copy (3), planning (1).
Sprint goal: extend zone-type template library from 2 to 31 zone types,
wire server structs for D-142, eliminate Clippy debt.

New ticket #676 created: assign teams to v0.2 story backlog (#614-#626).
Tickets #669 and #672 reassigned from maintenance to server.

Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
2026-03-16 22:47:55 +01:00
..