Three-way prep session (Jeroen + lead + Tyre) for the map-handler revision:
Jeroen's design outline captured verbatim, two clarification rounds, Tyre's
governance-delta/implications pass, brief co-written and ratified (zero
misrepresentations, zero blocking gaps), signed off by Jeroen with three edit
rounds (vocabulary repair tile->gridunit, client cache-store question with
SQLite fact base, explicit DQR/ticket deprecation sweep as gated deliverable).
Workshop: 5 seats (Dudley/Araminta/Stig/Tyre + Troblum r2), 2 rounds + lead
interview extendable at Jeroen's call, round 1 gated on measurements
T-1177/T-1178/T-1154/T-1179 (T-1180 non-gating). T-1176 in_progress with gate
blocker edges; T-1154 repurposed as measurement (3) and set ready.
Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>