Files
settled-reach/docs/sprints/sprint-32/planning.md
T
jpmschweitzerandClaude Opus 4.6 f1b97d4a88 fix(economics): address 17 PR review comments on #114
Blocking fixes:
- V-13: legal_services demand_model compliance→market (build-breaker)
- D-184: political flag names match TOML (commission_certified etc.)
- D-184: professional services list matches TOML
- D-173: elasticity count 5→4, cross-ref to D-184
- Workshop outcomes: fix self-contradicting fusion fuel statement
- R-011: move to end of file (was between D-183 and D-184)

Should-fix:
- D-166 domain link scope.md→architecture.md
- Sprint briefing counts updated (13→17 D-records, #801 marked done)
- Burnelli-Sheldon added to agent roster + briefing created
- questions-architecture.md footer tally updated
- medical_services demand_model utility→market
- timber display name drop "/Biomass"

Polish:
- D-171 Groombridge clarified (clearing house, not co-issuer)
- hospitality description has Reach texture
- commission_certification shadow_viable=false rationale in description
- Ticket #801 description updated
- Wiki pages regenerated

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-04-05 22:18:41 +02:00

1.5 KiB
Raw Blame History

Sprint 32: Landfall — Planning Tasks

Goal: Close Phase 1 — deliver remaining deliverables, validate pipelines with spikes, kick off Phase 2 economics design.

Agents: Gestalt (systems), Miri (worldbuilding), Tyre (technical), Paula (narrative), Nigel (replayability), Qatux (documenter), SI (project manager)

New Tickets

# Title Blocked by Status
#796 Phase 2 economics design kickoff DONE
#801 Define commodity catalog (TOML)
#804 Extend systems.db schema for economics

Use tooling/db/ticket show <id> for full details.

Notes

#796 Phase 2 economics design kickoff — DONE

Workshop complete. Produced 17 D-records (D-171D-187) in decisions/economics.md and 19 tickets (#797#815) under #747. See docs/sprints/sprint-32/workshop-796-round*.md and docs/workshops/commodity-catalog/ for full records.

#801 Define commodity catalog (TOML) — DONE

Delivered wiki/economics/commodities.toml (36 commodities) and wiki/economics/production_chains.toml (21 chains). Workshop produced D-184D-187. Follow-up tickets #811#815 created.

#804 Extend systems.db schema for economics

Server team ticket. Add tables: gate_links (from star-map.json), commodities, production_chains, chain_inputs, corp_presence. Add columns: currency_zone on star_systems, corporation extensions. Import gate adjacency data.

Reference: D-182 (TOML source of truth), Tyre's Round 2 schema spec.