Sprint 12: Build — Joint / Integration Notes
Goal: Lay the production-layer foundations — simulation tier system, sound event pipeline, visual grammar, and knowledge boundary enforcement — and complete all v0.1 copy authoring so content packs, opening hooks, and world-building docs are done.
Sprint 12 ID: 12
Status: planning (activate with db/connectors/sprint start)
Pre-Sprint Decisions
No blocking open decisions. The following decisions are implemented this sprint and should be cross-referenced:
| Decision | Domain | Implementing ticket(s) |
|---|---|---|
| D-041 (knowledge graph) | architecture | #138, #139 (KG access control) |
| D-018 (three-range sound) | perception | #124 (server), #125, #126 (client) |
| D-068 (5-bus audio architecture) | architecture | #125 (client wiring) |
| D-043–049 (art direction suite) | perception | #303 (visual grammar doc) |
| D-033, D-052 (entity color) | perception/content | #303 section 3 (covers #304) |
| D-066 (dual-scale grid) | architecture | #93, #94, #99 (tier system spatial indexing) |
Cross-Team Dependencies
| Dependency | From | To | Risk |
|---|---|---|---|
| #124 (sound events in ObserverSnapshot) | server | client #125 | Medium — client can stub; wire when ready |
| #193 (line previewer CLI) | server | copy #190, #191, #192 | High — content packs cannot be finalized without tool |
| #303 (visual grammar) | visual | copy #190, #191, #192 via #311, #312, #313 | High — spatial layouts blocked until doc delivered |
| #311, #312, #313 (spatial layouts) | visual | copy #190, #191, #192 | Medium — wireframes unblock draft content |
| #527 (rng_seed in snapshot) | ci | server bridge/types.rs | Low — additive field, no conflict if added carefully |
Coordination protocol:
- Server team: signal when #124 (sound events) and #193 (line previewer) are merged to
serverbranch. Copy and client teams are waiting. - Visual team: deliver wireframe versions of #311, #312, #313 immediately after #303 is done (even if full tile maps come later) so copy team can start content packs.
- CI team on #527: coordinate with server on
bridge/types.rs— confirm no concurrent edits. Add the field as an additive commit.
Sprint Completion Proof
When Sprint 12 is done, the following is concretely observable:
-
Simulation tier system: Spawn the test world, set NPC count to 20. Only NPCs within range of the player have
ActiveSim; distant NPCs haveBackgroundSim. Promoting an NPC (by walking toward it) takes <5ms. Demoting takes <5ms. Observable in the debug overlay or log output. -
Sound event pipeline end-to-end: In the gauntlet
dialogue_room, an NPC conversation emits Voice sound events. Close-range events play 2D positional audio on the client World SFX bus. Medium-range events show a color-coded fog-edge directional indicator. No audio errors in the log. -
Knowledge boundary enforcement: The observer query for an entity tagged
OwnerOnlydoes not return that component's data for a non-owner observer. Verifiable via Hoshe's unit tests on #139. -
Visual grammar document:
docs/design/visual-grammar-v01.mdexists with all 7 sections (color palette, entity sizing, entity color system, z-level stack, typography, animation tiers, insert overlay). All three spatial layout documents exist for The Terminal, The Last Shift, and the smuggling corridors. -
Line previewer CLI: Running
cargo run --bin line_preview -- --character smuggler --knows smuggling_operationagainst a content YAML returns matching lines and exits 0. -
v0.1 copy complete: All copy tickets in this sprint are
done. The content packs (#190, #191, #192), opening hooks (#299, #300), and all foundation docs (#189, #302, #321, #309) are committed to thecopybranch. -
CI hardening:
make ci-serverpasses withclippy::disallowed_typesenforced.--dump-scheduleflag runs without panic. WRONG buttonseed.txtwrites a valid u64, not"unavailable".
Test Plan Alignment (D-030)
Sprint 12 is in the integration phase (Sprints 9–12). Test focus:
- Server: Unit tests for tier system (#93, #94, #99) — promote/demote timing,
With<ActiveSim>query correctness. Unit tests for access control (#139) — negative tests: blocked component not returned. Sound event emission tests (#124). - Client: Audio playback tests for #125 — verify correct bus routing. Visual indicator tests for #126 — verify indicator renders at correct fog edge position.
- CI: Clippy lint enforcement (#343) — CI must fail on new HashMap usage in simulation crate. Tracing (#344) — binary runs without panic, log output captured.
Decision Coverage Gaps (from sprint prepare)
The following confirmed decisions still have no implementing tickets. Flag to Team Leader if any block Sprint 12 work:
- D-031 (time system / game clock) — no ticket yet; relevant to tier transitions (#99) and NPC routines
- D-033 (entity color = relationship) — covered by #303 visual grammar section
- D-038 (audio in v0.1 — 8 files) — assets done (Sprint 10); integration via #124/#125 this sprint
- D-067 (recognition chime at cognitive delay onset) — no ticket; could be added if capacity permits
- D-068 (5-bus audio architecture) — implementing via #125 this sprint
Notes for Sprint Start
To activate the sprint once planning is approved:
db/connectors/sprint start
This sets Sprint 12 to active and marks all sprint tickets as in_progress where appropriate. Teams should then run db/connectors/sprint start-work --team <team> for their full context dump.