Files
settled-reach/docs/atlas/corridor-assignments.md
T
jpmschweitzerandClaude Opus 4.6 20ac812f8c chore(atlas): corridor assignments + sprint tickets for 258 remaining systems
Epic #738: Body catalog completion with 5 corridor track stories:
- #739 Track A: North Reach (43 systems)
- #740 Track B: South Reach (47 systems)
- #741 Track C: East Reach (47 systems)
- #742 Track D: West Reach (48 systems)
- #743 Track E: Deep Frontier (73 systems)
- #744 Task: Add corridor-status command to atlas CLI

docs/atlas/corridor-assignments.md maps the parallel work structure.

Co-Authored-By: Claude Opus 4.6 (1M context) <noreply@anthropic.com>
2026-03-25 14:23:55 +01:00

1.4 KiB

Corridor Assignments — Body Catalog Authoring

258 systems remaining. Organized by corridor for parallel work.

Track Summary

Track Corridor Remaining Hop Range Notes
A North Reach 43 4-12 Commonwealth register
B South Reach 47 4-10 Iberian/LatAm register
C East Reach 47 4-10 East Asian register
D West Reach 48 4-11 Germanic/Scandinavian register
E Deep Frontier 73 5-12 Mixed/frontier register

Process

Each track runs on its own worktree branch. Within a track, process systems in hop order (closest to Gateway first).

Per system: run /atlas author-system "{system_id}" — the skill handles wiki analysis, skeleton generation, Miri naming, Paula review, Ozzie+Paula dual quality check, integrity verification, and commit.

Parallelization Rules

  • Multiple tracks can run simultaneously on separate branches
  • DB commits serialize through main after branch merge
  • Name collision checks run against the full DB before each commit
  • PO reviews at corridor-batch level (after each hop tier completes)

Generated from systems.db on 2026-03-25

Remaining count by sector + hop:

deep_frontier: 73 (hops 5-12)
west_reach:    48 (hops 4-11)
east_reach:    47 (hops 4-10)
south_reach:   47 (hops 4-10)
north_reach:   43 (hops 4-12)