Files
settled-reach/docs/backups
jpmschweitzerandClaude Sonnet 4.6 0f1eda8d12 chore(meta): restructure Sprint 25 per feasibility study
Dependency chain inverted: #611 (NpcBlueprint structs) now goes first
and defines the schema contract. Copy team (#609, #610) fills YAML to
match Tyre's structs rather than the other way around.

#613 (NPC generation pipeline) cancelled and absorbed into #612 — the
NPC pipeline is the print loop at the end of the generator binary, not
a separate ticket.

Ticket descriptions loosened: strip over-specified acceptance criteria,
replace with intent + scope boundaries. Phoneme generation explicitly
out of scope for #610 (name lists are sufficient). #612 gains a phased
approach note (Phase 1: hardcoded stubs, Phase 2: real YAML) so server
can build in parallel with copy.

Briefings updated to reflect inverted chain, two-ticket server sprint,
and exploratory framing: this sprint discovers the right spec, it does
not implement a known one.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-03-06 20:44:01 +01:00
..