# Si - Project Briefing Last updated: 2026-02-11 ## Current Project State The Settled Reach: top-down immersive sim, single-character perspective, asymmetric information core mechanic, Rimworld-style storyteller. 41 confirmed decisions, 17 discussion rounds + 2 workshops complete. Engine selected (D-020). Vertical slice defined (D-027). v0.1 Content Gap Analysis Workshop complete — ~50 tickets identified across 7 categories. Knowledge Graph & Information Boundaries Workshop complete (D-041) — Sprint 2 ticket impact requires reconciliation with existing #49 epic children. ## Decisions Relevant to Your Role All decisions across all domains. Read `decisions/README.md` for the index. Query decisions DB for sprint planning: ```bash make decisions-coverage # Decision-to-ticket coverage by domain make decisions-orphan # Decisions without implementing tickets make decisions-active # List all active decisions ``` ## Open Questions Assigned to You All open questions - tracks as tickets for assignment and progress monitoring. ## Current Priorities Create sprint plan for vertical slice implementation (D-027). Break D-024 through D-041 into tickets. Workshop output (`docs/workshops/content-gap-analysis_v0_1/SUMMARY.md`) contains ~50 deduplicated ticket proposals across 7 categories. Track dependencies: - Paula's Dual Lens Authoring Guide (#261) — critical path, blocks all downstream content - Miri's contraband spec + Sova texture appendix (blocks Mellanie) - Gestalt's tag taxonomy spec + knowledge state vocabulary — **UNBLOCKED by D-041** (Appendix A provides v0.1 vocabulary) - Hoshe's test plans (must precede implementation) - NPC ECS model (blocks template instantiation) - Template system (blocks dialogue system) - **Knowledge graph system (D-041)** — Sprint 2 priority, blocks #112, #358, #356. Requires ticket reconciliation with #49 epic. Vertical slice implementation + content authoring are now parallel workstreams — coordinate with Team Leader on sequencing and resourcing. ### Knowledge Graph Workshop Ticket Impact (D-041) See synthesis Part 8 for full details. Key actions: 1. **Create 8 new tickets** as children of #351 (KnowledgeGraph component, StableEntityId, KnowledgeEventQueue, direct observation flow, basic decay, observer snapshot integration, unit tests, vocabulary for #309) 2. **Reconcile existing #49 children:** Reparent #89, #138-142, #269, #272, #182, #360 under #351 or mark as resolved/deferred 3. **Update #112 description** with interface contract from synthesis Part 7 4. **Update sprint 2 dependencies:** KnowledgeGraph blocks #112, StableEntityId blocks #360, observer snapshot integration blocks #358/#356 ## Development Workflow See `docs/DEVOPS.md` for full procedures. Key awareness for sprint planning: - `make ci` must pass before any PR merges — definition of done includes CI green - `make ci-server` = lint-server → build-server → test-server - `make ci-client` = lint-client → build-client → test-client - Server work lives in `server/`, client work in `client/`, cross-boundary tests in `tests/` - Hoshe's test plans target these directories per D-030 testing architecture ## Key Documents - decisions/ - domain-split decision files (see decisions/README.md for index) - docs/DEVOPS.md - build, test, lint, CI procedures - docs/discussions/ - archived rounds - TEAM.md - team roster