 jpmschweitzerandClaude Sonnet 4.6
|
521c682175
|
chore(meta): plan Sprint 35: Atlas
Phase 3 launch sprint. 13 tickets across server, client, copy.
Atlas generation pipeline (terrain_reference, generate_atlas.py, Gemma naming),
brand layer DB schema, Atlas implant panel (3 levels + heightmap viewer + overlays),
hand-authored templates for Lendel + 4 core systems, brand corp TOML,
brand_templates.toml (120-130 archetypes), wiki glossary, world seed wiring.
Co-Authored-By: Claude Sonnet 4.6 (1M context) <noreply@anthropic.com>
|
2026-04-11 22:01:42 +02:00 |
|