Commit Graph
5 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 1e5a1fb23a docs(docs): add frontmatter to workshops README
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-03-14 00:01:58 +01:00
jpmschweitzerandClaude Opus 4.6 5c3c2a527b docs(workshops): Control & Interaction Workshop outputs
Workshop notes (2 rounds), outcomes document (13 decisions, 27 tickets,
v0.1 interaction model), and updated brief with final lead direction.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-14 09:34:49 +01:00
jpmschweitzerandClaude Opus 4.6 8c95bda639 docs(workshops): add control & interaction brief, update workshop index
Add workshop brief for Control & Interaction Scheme (next workshop).
Update index with wiki-review (complete) and v0.1-content-scoping
(complete, 38 tickets).

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 16:19:10 +01:00
jpmschweitzerandClaude Opus 4.6 1920f002a1 docs(workshops): add 5 architecture spike workshop briefs
Workshop briefs for the larger spikes identified by the architecture
review audit: knowledge graph & information boundaries, observer
snapshot pipeline, NPC AI state machines, save/load architecture,
and map authoring pipeline. Each includes participants, key questions,
input documents, and expected outputs.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 21:36:02 +01:00
jpmschweitzerandClaude Opus 4.6 6f9eda5079 docs(discussions): add Round 18 v0.1 gap analysis workshop
7 agents across 2 rounds stress-tested the 232-ticket v0.1 plan against
concept proof, fun delivery, completeness, and testability. Key outcomes:
D-030 testability architecture confirmed, 15 priority promotions, 41 new
tickets (273 total), replay ceiling estimated at 10-12 playthroughs.
Reorganized workshops into per-workshop directories.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 01:11:02 +01:00