Commit Graph
4 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Sonnet 4.6 c056ea1a1c feat(content): migrate line IDs to NPC-scoped namespace (D-035)
Line IDs in all dialogue and monologue pool files renamed from the
old location-scoped format (e.g. the-terminal_d_039) to the new
NPC-scoped format (e.g. kael-davan_d_001) per the D-035 Sprint 15
amendment.

Changes:
- 20 dialogue pool files across 3 locations renamed
- 14 monologue pool files (detective + smuggler) renamed
- Schema descriptions updated in dialogue/monologue schema files
- Authoring style guide and design docs updated with new examples
- Multi-location NPCs (kael-davan, pc-detective, pc-smuggler) given
  globally unique cross-file sequences to satisfy XREF uniqueness check

The location-scoped scheme already caused a collision (the-terminal_d_039
appearing in multiple NPC files) and would not scale to procedurally
generated NPC populations (D-029). Zero content changes — pure ID
substitution.

Co-Authored-By: Claude Sonnet 4.6 <noreply@anthropic.com>
2026-02-23 21:04:43 +01:00
jpmschweitzerandClaude Opus 4.6 f0bab3999d chore(skills): rename all skills to domain-action convention
Adopts the whatsinagame naming pattern where the domain comes
first and the action second (e.g. pr-review, sprint-start,
audio-gen). Updated all cross-references in settings, agents,
docs, and inter-skill references.

12 renames: commit→git-commit, create-skill→skill-create,
gen-audio→audio-gen, gen-image→image-gen, plan-sprint→sprint-plan,
push-pr→pr-push, render-sprite→sprite-gen, review-pr→pr-review,
search-docs→docs-search, start-sprint→sprint-start,
start-workshop→workshop-start.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-19 12:51:56 +01:00
jpmschweitzerandClaude Opus 4.6 a87c95a6eb docs(workshops): complete QA test architecture workshop
3-round workshop with 7 agents (Tyre, Dudley, Stig, Hoshe,
Justine, Gestalt, Ozzie) plus Qatux documenting. Produced:

- 59-item prioritized test backlog (60 tickets under epic #455)
- Gauntlet test world spec: 7 rooms + hub, 48 entities
- Test client binary spec (tooling/test-client/)
- Determinism fixes (3 patches, ~22 lines)
- Server --test-mode + --port 0 design
- Content cross-reference validation (9 checks)
- make pre-pr pipeline (6-step)
- 38 client tests prioritized
- Anti-tedium features (reset plate, hub teleport, WRONG button)
- Human tester walkthrough
- CI pipeline design (deferred but documented)

Sprint 8 scope: ~17.75 team-days across 26 tickets.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-17 14:00:15 +01:00
jpmschweitzerandClaude Opus 4.6 21edbfec19 docs(workshops): add test architecture workshop brief
4-track workshop targeting the class of bugs from Sprint 6-7: blocking
I/O, serialization boundaries, state desync, off-by-one encoding.
Participants: Tyre, Hoshe, Dudley, Stig. Covers integration test
architecture, serialization boundary tests, client test infrastructure,
and test gap prioritization. Includes catalogue of 6 real bugs.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-16 23:26:41 +01:00