Commit Graph
9 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 ef091de281 docs(sprints): regenerate sprint 3 briefings from database
Previous briefings referenced tickets not assigned to sprint 3.
Rewrote all four team briefings (server, client, joint, copy) to
match actual sprint 3 ticket assignments in the database.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 17:15:16 +01:00
jpmschweitzerandClaude Opus 4.6 ed09439a31 docs(sprints): add Sprint 3 "Know" team briefings
NPC data model, pathfinding, observation events, and interaction
foundation. Briefings for server, client, joint, and copy teams.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 02:14:52 +01:00
jpmschweitzerandClaude Opus 4.6 715c7e16ab docs(sprints): add copy team briefing for Sprint 2
Sprint briefing for #368 (knowledge vocabulary for v0.1 content).
Defines FactId categories, known_attributes keys, and
RelationshipState transition patterns the copy team needs to deliver.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-12 01:31:00 +01:00
jpmschweitzerandClaude Opus 4.6 93abd9b9d0 docs(workshops): complete Knowledge Graph & Information Boundaries workshop
Two-round workshop producing D-041 (Knowledge Graph Data Model):
- Round 1: independent analyses from Dudley, Gestalt, SI, Tyre, Paula
- Round 2: synthesis resolving debates + Gestalt mechanics validation

Key decisions:
- 4-level confidence hierarchy (Suspects < KnowsOf < KnowsDetails < Direct)
- BTreeMap for deterministic iteration (D-010 principle 4)
- Per-entity Component model, not centralized Resource
- StableEntityId + EntityRegistry for save/load stability (partial Q-019)
- Sprint 2 stub: structs + direct observation + basic decay (~6.5 dev-days)

Resolved Q-016 (knowledge hierarchy), raised Q-024/Q-025/Q-026.
Created tickets #361-#368 under epic #351, reconciled #49 children.
Updated sprint 2 briefings, agent briefings, and decision files.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 23:24:37 +01:00
jpmschweitzerandClaude Opus 4.6 160add9719 docs(sprints): update sprint 2 briefings with ticket IDs and dependencies
Server team added #356-#360 for pre-sprint design tasks and
integration milestones. Updated server.md and joint.md with
actual ticket numbers, dependency chains, and done status.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 22:30:05 +01:00
jpmschweitzerandClaude Opus 4.6 79603c9a7f chore(db): add sprint 2 pre-sprint tickets and update joint briefing
Server team added #356-#360: fog bridge, sprint proof, snapshot
v2 schema, Q-018/Q-019 resolution tasks. Updated joint.md with
actual ticket numbers and #81 done status.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 22:24:09 +01:00
jpmschweitzerandClaude Opus 4.6 7f97cb7ce3 docs(sprints): add Sprint 2 "See" briefings for server, client, joint
Sprint 2 goal: fog of perception working through the bridge. Server
computes LOS visibility, client renders fog. Carries over #236 and #81
from Sprint 1.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 21:45:38 +01:00
jpmschweitzerandClaude Opus 4.6 91db2f99de docs(sprints): add PR workflow instructions to sprint briefings
All three sprint briefings now include tea CLI PR creation example
with required --login and --repo flags to avoid TTY prompts.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 19:26:15 +01:00
jpmschweitzerandClaude Opus 4.6 116b6c308c docs(sprints): add Sprint 1 team briefings
Per-team sprint briefings under docs/sprints/sprint-1/ for server,
client, and joint tracks. Each lists assigned tickets, dependencies,
key decisions to read, and implementation notes. Agents use
ticket show <id> for full details.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-11 18:49:49 +01:00