Commit Graph
2 Commits
Author SHA1 Message Date
jpmschweitzerandClaude Opus 4.6 a87c95a6eb docs(workshops): complete QA test architecture workshop
3-round workshop with 7 agents (Tyre, Dudley, Stig, Hoshe,
Justine, Gestalt, Ozzie) plus Qatux documenting. Produced:

- 59-item prioritized test backlog (60 tickets under epic #455)
- Gauntlet test world spec: 7 rooms + hub, 48 entities
- Test client binary spec (tooling/test-client/)
- Determinism fixes (3 patches, ~22 lines)
- Server --test-mode + --port 0 design
- Content cross-reference validation (9 checks)
- make pre-pr pipeline (6-step)
- 38 client tests prioritized
- Anti-tedium features (reset plate, hub teleport, WRONG button)
- Human tester walkthrough
- CI pipeline design (deferred but documented)

Sprint 8 scope: ~17.75 team-days across 26 tickets.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-17 14:00:15 +01:00
jpmschweitzerandClaude Opus 4.6 21edbfec19 docs(workshops): add test architecture workshop brief
4-track workshop targeting the class of bugs from Sprint 6-7: blocking
I/O, serialization boundaries, state desync, off-by-one encoding.
Participants: Tyre, Hoshe, Dudley, Stig. Covers integration test
architecture, serialization boundary tests, client test infrastructure,
and test gap prioritization. Includes catalogue of 6 real bugs.

Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
2026-02-16 23:26:41 +01:00