System S-057 assigned to real star GJ 35 (Van Maanen's Star, DG white
dwarf at 13.9 ly). Renamed across all content, server code, docs,
decisions, wiki lore, and config files. 224 files updated.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Standardized YAML frontmatter on all 115 sprint briefing files across
sprints 1-26 with title, description, type, status, sprint number, and
team fields.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Move wiki from docs/wiki/ to root wiki/. Add 14 category templates with
YAML frontmatter, governance model, hierarchical spatial structure
(system > station > district > location). Populate Krenn System entry
as first concrete star system. Update cross-references in workshop and
sprint docs.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Previous briefings referenced tickets not assigned to sprint 3.
Rewrote all four team briefings (server, client, joint, copy) to
match actual sprint 3 ticket assignments in the database.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
NPC data model, pathfinding, observation events, and interaction
foundation. Briefings for server, client, joint, and copy teams.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>