7 client tickets closed (#435-437, #470, #476-478) after
PR #25 and PR #26 reviews completed and merged.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Sprint 8: React — briefings for server, client, audio, and joint teams.
Database snapshot after Sprint 8 ticket assignments.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
Server PR #23 bumped PROTOCOL_VERSION to 7 (pending_recognitions field).
Client must match before #431 fog entity visualization or joint testing.
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>
- tooling/db-backup: copies shared settledreach.db to docs/backups/
for git tracking (main branch only)
- tooling/db-install: restores from backup for new clones
- make db-backup / make db-install Makefile targets
- worktree-update skill runs make db-backup after merges on main
Co-Authored-By: Claude Opus 4.6 <noreply@anthropic.com>