chore(meta): cascade refocus — supersede v0.2 cluster, re-home backlog tree, capture workshop WIP

Governance:
- D-166 amendment (2026-06-12): outside-in build order (geo → econ-on-world →
  building templates → door boundary contracts → NPC/interiors → gameplay);
  Phase 5 ramps in parallel once outsides are walkable (gate: T-962)
- D-114/D-115/D-117/D-118/D-120 marked superseded by D-166 (inbound anchors fixed)
- D-221 amended: milestones retired, cascade-hierarchy gating is canonical
- Q-077/Q-068/Q-036 resolved (answered by events); Q-110 (scale anchoring) and
  Q-111 (live-econ coupling) opened from cascade grounding

Ticket tree (147 stray backlog tickets dispositioned):
- New parents: T-1036 (post-cascade gameplay parking), T-1037 (maintenance initiative)
- Re-homed: 15 → Phase 4 (T-750), 30 → Phase 5 (T-749), 11 → Phase 6 (T-751),
  21 → gameplay parking, 28 → maintenance; children follow their epics
- Cancelled 12 administrative shells (mirror tickets, emptied pre-cascade umbrellas,
  v0.2 pivot shell T-603); T-9/T-28 closed done; T-745 in_progress
- New grounded tickets T-1038..T-1044: inter-settlement road/rail graph, L3→L4
  dispatch threading, river-channel-anchor bug, 64m landform-repeat bug,
  region seam blending, road-entry octants, drainage re-run fix

Docs:
- CLAUDE.md cascade paragraph updated to the amended rule
- 20 v0.1-era docs/design files marked superseded with pointers;
  content-structure-canonical retitled (v0.2 label dropped)

Co-Authored-By: Claude Fable 5 <noreply@anthropic.com>
This commit is contained in:
2026-06-12 12:26:32 +02:00
co-authored by Claude Fable 5
parent 5adf2b8bd7
commit ca255dc16c
35 changed files with 2100 additions and 62 deletions
+2 -1
View File
@@ -84,7 +84,8 @@ How the team works: composition, naming, workflow.
- **Source:** Q-096 (raised 2026-04-20, expanded 2026-05-01)
- **Raised by:** Jeroen
- **Dissent:** None
- **Amendment (2026-06-12):** **Milestones are retired.** pql has no milestone entity; phase gating is the **cascade ticket hierarchy** — initiative T-745 holds the six phase epics, a ticket is in a phase by being parented under that phase epic, and the active phase is the `in_progress` phase epic (currently T-750, Phase 4). The two milestone bullets above ("Sprint boundaries → milestones tied to concrete deliverables" and "Milestones are many-to-many with tickets, can run in parallel, can block other milestones") are superseded by this mechanism; kanban, topic branches, and the rest of the record stand. Phase-independent maintenance and test-debt work lives under a dedicated maintenance initiative rather than a phase epic. See CLAUDE.md "Work Modes" and `.claude/rules/ticket-cli.md`, which already describe the hierarchy model.
---
*5 decisions. Last updated: 2026-05-03*
*5 decisions. Last updated: 2026-06-12*