Files
portainer-core/PLANS.md
T
jpmschweitzer e3b451b7b0 feat(ai): complete ADK migration and optimize system health checks
Major architectural changes and improvements:

## ADK Framework Migration (v0.10.0)
- Migrated from LangChain/LangGraph to Google ADK 1.3.0 with LiteLLM 1.80.5
- Improved tool calling reliability with local Ollama models
- Converted all 10 tools to ADK async generator format
- Updated streaming pipeline for ADK event system
- Enhanced error handling and agent initialization

## Model Optimization
- Switched from gemma3:12b (10GB VRAM) to gemma3:4b (4.8GB VRAM)
- Reduced VRAM usage from 91% to 43% (5.4GB freed)
- Optimized for production stability with memory headroom

## Health Check System Overhaul
- Optimized /health/full: 6ms response (was 30s+)
- Added model verification: confirms configured model is available
- New /health/diagnostics endpoint with optional deep testing
- Added currently loaded models tracking
- Clear emoji status indicators (//⚠️)
- Fixed AGENT_AVAILABLE flag export for proper health reporting

## Ollama Client Enhancements
- Added list_models() method for model inventory
- Enhanced model verification in health checks
- Better error handling and reporting

## Documentation Updates
- Updated STATUS.md to v0.10.0-adk-migration
- Comprehensive CHANGELOG.md entry with migration details
- Updated PLANS.md showing Phase 4 complete
- Updated ai-orchestrator-plan.md with ADK status
- Added MIGRATION_PLAN_LANGCHAIN_TO_ADK.md
- Added ADK_Ollama_Research.md with implementation analysis

## Technical Details
- 10 tools: 7 infrastructure + 2 research + 1 response tool
- Framework: Google ADK with UnifiedAgent pattern
- System prompt: v7_adk_best_practice
- Container health: Now passing Docker healthchecks
- Response times: Simple queries ~0.3-1s, Research ~4-7s
2025-11-26 08:36:50 +01:00

5.7 KiB

Implementation Plans

This document tracks all implementation plans across the portainer-core project.

Active Plans

Current implementation work in progress:

AI Orchestrator Enhancement

Location: plans/active/ai-orchestrator-plan.md Status: Phase 4 Complete - ADK Migration Successful Phases:

  • Phase 1: OpenAI-Compatible API (Completed 2025-11-13)
  • Phase 2: Memory Systems (Completed 2025-11-23)
  • Phase 3: Research Capabilities (Completed 2025-11-24)
  • Phase 4: Framework Migration - LangChain → Google ADK (Completed 2025-11-26)
  • 📋 Phase 5: Multi-Agent Patterns (Future)
  • 📋 Phase 6: Production Hardening & RAG Optimization (Future)

Framework Migration Completed (2025-11-26) :

  • Migrated from LangChain/LangGraph to Google ADK 1.3.0
  • Integrated LiteLLM 1.80.5 for Ollama compatibility
  • Converted all 9 tools to ADK async generator format
  • Upgraded model: mistral:7b → gemma3:12b
  • Optimized system prompt: v7_adk_best_practice
  • Enhanced agent health monitoring
  • Production testing and validation

Migration Benefits Achieved:

  • Improved tool calling reliability with Ollama models
  • Better streaming support with ADK event system
  • Model flexibility (Gemma, Mistral, Qwen families supported)
  • Cleaner, more maintainable architecture
  • Production-ready health monitoring

Current Implementation:

  • Framework: Google ADK 1.3.0 with LiteLLM
  • Model: gemma3:12b (~8GB VRAM)
  • Tools: 9 total (7 infrastructure + 2 research)
  • Performance: Simple queries ~0.3-1s, Research ~4-7s

Memory Architecture

Location: plans/completed/phase2-memory-system-complete.md Status: Completed 2025-11-23 Description: 3-tier memory system (buffer, Qdrant persistent + semantic) with multi-tenancy

Security Implementation

Location: plans/active/security-implementation-plan.md Status: 📋 Planning Phase Description: Google OAuth SSO via Authentik for external service access


Completed Plans

Historical implementation plans that have been finished:

Infrastructure Deployment (Phases 1-4)

Location: plans/completed/infrastructure-deployment-plan.md Completed: November 2025 Phases:

  • Phase 1: Foundation (Portainer, NPM, Ollama)
  • Phase 2: Networking (Headscale mesh VPN)
  • Phase 3: Monitoring (Uptime Kuma, Netdata, Heimdall)
  • Phase 4: Optimization (Watchtower, Duplicati)

AI Orchestrator Phase 1

Location: plans/completed/ai-orchestrator-phase1-guide.md Completed: November 2025 Deliverables: OpenAI-compatible API with model routing, streaming, function calling

AI Orchestrator Phase 1 Testing

Location: plans/completed/ai-orchestrator-phase1-tests.md Results: 10/10 tests passed, zero issues found

AI Orchestrator Phase 2 (Memory System)

Location: plans/completed/phase2-memory-system-complete.md Completed: 2025-11-23 Deliverables: 3-tier memory (buffer + Qdrant), multi-tenancy, auto-consolidation

AI Orchestrator Phase 3 (Research Capabilities)

Location: plans/completed/phase3-multi-agent-workflows-complete.md Completed: 2025-11-24 Deliverables: Web search (DuckDuckGo), content scraping, research detection, 100% test success

AI Orchestrator Phase 4 (Framework Migration)

Location: MIGRATION_PLAN_LANGCHAIN_TO_ADK.md Completed: 2025-11-26 Deliverables: Google ADK 1.3.0 with LiteLLM, 9 tools migrated, gemma3:12b model, improved reliability

Architecture Research

Location: plans/completed/architecture-research.md Completed: October 2025 Decision: Portainer + Docker Compose for container orchestration

Mesh Networking Strategy

Location: plans/completed/mesh-networking-strategy.md Completed: November 2025 Solution: Headscale (self-hosted Tailscale) for secure mesh VPN

Dashboard Consolidation Strategy

Location: plans/completed/dashboard-strategy.md Completed: November 2025 Solution: Organizr with custom service control widgets


Plan Management

Creating New Plans

  1. Create plan in plans/active/ directory
  2. Add entry to "Active Plans" section above
  3. Update STATUS.md with phase tracking
  4. Link from relevant documentation

Completing Plans

  1. Mark all phases as in the plan document
  2. Move from plans/active/ to plans/completed/
  3. Update this file (move to "Completed Plans" section)
  4. Update STATUS.md
  5. Update CHANGELOG.md with release notes

Plan Template

# [Feature Name] Implementation Plan

## Overview
Brief description of the feature/improvement.

## Motivation
Why this change is needed.

## Phases

### Phase 1: [Name]
**Status**: 📋 Planned / 🔄 In Progress / ✅ Completed
**Duration**: Estimated effort
**Deliverables**:
- [ ] Task 1
- [ ] Task 2

## Success Criteria
How to determine if implementation is complete.

## Testing Strategy
How the feature will be validated.