# Triage Triage turns reports into evidence-backed work that a maintainer can pick up without guessing. ## Intake flow ```text Report -> reproduce / clarify -> identify duplicates and affected versions -> classify impact, urgency, and risk -> prepare actionable work item -> maintainer takes ownership -> PR, verification, and follow-up ``` ## A useful work item Record what is known and distinguish it from what remains unverified: - Original report and reproducible steps; installation method, OS, version/commit, and relevant environment. - Expected versus actual behavior, including user-visible impact. - Evidence: sanitized logs, screenshots, failing tests, or controlled reproduction. - Related issues, PRs, duplicates, or a known prior regression. - Scope, acceptance criteria, and non-goals. - Priority, ownership, and relevant domain expertise. - Remaining unknowns, risks, and safe recovery or workaround when available. Small and obvious fixes may go straight to a focused PR, consistent with [CONTRIBUTING.md](../../CONTRIBUTING.md) and [changes and review](changes-and-review.md). ## Practical priority language Use P0-P3 as **triage shorthand**, not as a substitute for verified exploitability or the project's actual GitHub labels: | Priority | Typical impact | Expected response | |---|---|---| | P0 | Active exploitation, broad irreversible loss, catastrophic outage | Immediate containment and escalation | | P1 | Credible severe security or data-integrity vulnerability | Urgent owner assignment and validated fix | | P2 | Significant correctness, security, or operational regression | Prioritize and resolve before approving affected high-risk changes | | P3 | Limited impact, maintainability, or low-risk polish | Fix or explicitly track with rationale | Do not call a concern harmless merely because an automated check is green. Escalate privately when reproduction would disclose a vulnerability. ## Where decisions live Matrix is for coordination; durable decisions belong in GitHub, Plane, a specification, or the relevant PR. Keep confidential security and access details in appropriate private channels. Do not leave important project decisions only in chat history. See the [review playbook](review-playbook.md) for converting triage into review evidence and handling contested or uncertain findings.