file 2026-05-14 consultant review backlog (T-97..T-114)
Epic T-97 + 17 children covering the consultant review findings:
- T-98..T-101: Critical (workspace RCE, IPC server, keyboard
operability, onboarding docs).
- T-102..T-111: Major (symlink escape, push-check scope, IPC schema,
focus traversal, scheduler race, terminal sweep, test sleeps, docs
release, keybinding architecture, drag-resize parity).
- T-112..T-114: Quick-win batches (code quality, governance/docs
reconciliation, a11y/contrast gate).
Each ticket cites the source section of consultants.md. Cross-deps
noted in body where they exist (e.g. T-105 depends on T-100).
Co-Authored-By: Claude Opus 4.7 (1M context) <noreply@anthropic.com>